Laserfiche WebLink
of <br /> UNDERGROUND STORAGETANK <br /> RESPONSE PLAN® PAGE 1 (One form per facility) <br /> PE OF ACTION 0 I.NEW PLAN 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> Grant Line Shell #136187 <br /> BUSINESS SITE ADDRESS R03 CITY R04. <br /> 2375 W.Grant Line Road Tracy <br /> 11. SPILL CONTROL AND CLEANUP METHODS . <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> > If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too <br /> saturated to be effective. It will then be managed property.Used absorbent material,reusable or waste,will be stored in a property labeled and scaled container. <br /> > Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the Water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> > We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> 111. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> ,'RIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete only if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Service Station Services R10. 680 Quin Ave R20- Available at all times R30. <br /> San Jose,CA 95112 <br /> Additional equipment provided by the RIL 800-628-5510 R21, R31. <br /> responding contractor. <br /> R12. R22. R32. <br /> R13. R23. R33, <br /> R14, R24. RX <br /> R15. R25. P35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40 TITLE RW <br /> Javier Arellano MANAGER <br /> NAME R41- TITLE R51. <br /> Steve Darretta Ganeral Manager <br /> NAME R42 TITLE R52. <br /> Aura Sibley I HS&E Compliance Coordinator <br /> NAIME R53. <br /> William Merchant P43. I TITLE Facilities Engineer <br /> V. MONITORING INDICATORS <br /> MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> Ll Additional system testing or data collection 0 Inspection by qualified persons 0 Recalibration of equipment <br /> 171 Other: <br /> L;ST Response Plan(3r-008)313 <br />