My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 2:40:22 PM
Creation date
6/23/2020 6:56:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2375\PR0232469\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI UNDER DiSPENSERCONTAINMENT UDC MONITORING <br /> 490-540- <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> El 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑99.OTHER(Specify):--_—-- ----_- <br /> --------------- -------------- — <br /> — <br /> ----------------- <br /> PANEL MANUFACTURER: Beaudreau 490 55 f MODEL#: 522T ----- 490-56.LEAK SENSOR MANUFACTURER: Beaudreau -- _ 49057 MODEL#(S):EOS100 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS C7 I.SINGLE-WALLED ❑ 2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ 1.LI UID ❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> ;; . .r.•: °.,.. ,' ? II•PERIODIC$YSTEM- <br /> �TESTING�,,,J.. +:r:,... ,.,;,:� �:•f. .�f,! S�:!,.,, . .t-. <br /> ❑ 1. ELD TESTING. THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(E_LD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED_(23 CCR§2644.1 <br /> 66 <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49---- <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> ,..j `l e' f #tU 7 u�yf t+.s< s}I r (• <br /> ti4N, <br /> e b 7 e�.t�. <br /> VIII;RECORDKEEPIIVG ft.;: r! s, a, .. ,,i <br /> "t r� �.:?-. �u.ti�,..�y'S h .li,i...r�•�} ,!`,.,F,..;e:. �.e.«.. f!..�.• J r FSY 15 <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-68a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> ❑SIR testing results(and supporting documentation records). 490-6ed ❑ Tank gauging results(and supporting documentation records). 490-69e <br /> ❑ATG Testing results(and supporting documentation records).490-6ef ❑ Corrosion Protection 60-day logs 490-688 <br /> ®Equipment maintenance and calibration records. 490-68h <br /> TRAINING ' <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69e <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-691; <br /> ❑ OTHER(Specify):M691,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not Iimited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> i<<X:iCOMMENTS/ADDITIONAL'INFORMATION: <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> Fill Sump Sensors: Veeder Root 794380-208, Regular-IB Turbine Sump-208 ogerVtl,'PrcA Chon,SAI and floc-. <br /> Regular,Plus and Premium tanks have two sump's with two turbine's/Sump sensors#794380-352/Alarm set at 95% <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Javier Arellano 490-72 TITLE Manager 490-73 <br /> NAME Steve Darretta 490-74 TITLE General Manager 490.15 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE' <br /> C IFI ION:I certify that the• f6nation provided herein is true and accurate to the best of my knowledge. <br /> APPLIC G T E 490-76 DATE: 490-11 <br /> November 17,2009 <br /> wn A h ri r n ativ wn <br /> APPLI NT NAME( in 490-78 APPLICANT TITLE: 490-79 <br /> Aura Sibley for Shell Oil Products US HS&E Compliance Coordinator <br /> UST Response Plan(3/2008)3/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.