My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 2:40:22 PM
Creation date
6/23/2020 6:56:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2375\PR0232469\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN -04-2008 14:45 Service Station Systems 408 938 8888 P.14 <br />14. SPI.LIJOVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard C1 Professional Engineer <br />® Other (Specify) <br />Test Method Used: <br />® Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Ineon Sump Tester <br />Vapor SpiEl Box # 87 Vapor Spill Box # 89 <br />Equipment Resolution; +/-0.002" <br />Vapor Spill Box # 91 <br />Bucket Diameter: <br />12" 12" <br />12" <br />Bucket Depth: <br />1o°' 1.0" <br />10„ <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min. 10 min. <br />10 min. <br />Test Start Time: <br />7:58 am 7:58 am <br />8:48 am <br />Initial Reading (110: <br />5.3221 5.2877 <br />4.8481 <br />Test End Time: <br />8:13 am 8:13 am <br />9:03 am <br />Final Reading UW: <br />5.3197 5.2885 <br />4.8481 <br />Test Duration: <br />15 min. 15 min. <br />15 min. <br />Change in Reading (12F -RI): <br />-0.0024 +0.0008 <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />4-0.0021, +/-0.002" <br />+/-x.002" <br />Test Result: <br />Pass ® Fail ® Pass Fail <br />fM Pass Fail <br />Comments s (include in ormadbn on repairs made prior to testing, and reconimanded follow-up for failed tests) <br />87 vapor bucket failed. Possible swivel adaptor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.