Laserfiche WebLink
41 <br />Good Afternoon Inspector Barker, <br />We went out to pre-test the secondary for the site. There were some bad test boots that need to <br />be replaced. We ordered them and are waiting for them to come in. Once we have them, we will <br />install them and call you back out for the Secondary Pressure test. Please let me know if you have <br />any questions. <br />Best Regards, <br />Scott Willett, MBA <br />Project Manager <br />DiMaggio Maintenance, Inc. <br />P.O. Box 1637 <br />Carlsbad, CA 92018 <br />Cell: (760) 277-2117 <br />Office: (760) 722-9002 <br />Email: scott@dimaggiomaintenance.com <br />