My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 8:57:40 AM
Creation date
6/23/2020 6:56:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • ' <br /> The parts needed for this correction have been ordered from the <br /> manufacture ( Bravo) and will be delivered by 09/04/18. The contractor has <br /> assured me that they will be installed and site back to compliance by <br /> 09/10/18. I am sorry for the delay, but due to number of dispensers at the <br /> site, the contractor did not have enough parts in inventory. <br /> Chittal Shah <br /> Maintenance Manager <br /> 1450 N.Benson Avenue <br /> Upland, CA 91786 <br /> Cell: (951) 313-7490 <br /> cshahCa-_)anabioil.com <br /> Chittal Shah <br /> cshah61anabioil.com <br /> 951-313-7490 <br /> From: Zuna J. Barker [EH] <zbarker(absjcehd.com> <br /> Sent: Friday, August 17, 2018 8:45 AM <br /> To: Chittal Shah <cshah(abanabioil.com>; grantlineshell <br /> <grantlineshell(c carenterprisesinc.net> <br /> Cc: Summer Ireifej <sireifej(a)carenterorises.net> <br /> Subject: Follow up for the non compliance <br /> Good morning, <br /> I would like to follow up with this you in regards to the compliance of this <br /> site. I received an email from Mr. Shah on 7/31/2018 with the following: <br /> <image001.jpg> <br /> Followed by another email with the following: <br /> <image002.jpg> <br /> Since then I have not received any other document correcting the <br /> violations that are outstanding for this site. Please be aware that any follow <br /> up being done is chargeable. <br /> Here is the list of violations that remain open. <br /> Open violations from May 15,2018 inspection <br /> Violation#301-UST system is not operated to prevent unauthorized release,including spills and <br /> overfills. <br /> The fuel filters under the dispensers are not located to allow drips and leaks to drain back into <br /> the UDC.The <br /> underground storage tank system shall be operated to prevent unauthorized releases. <br /> Immediately provide <br /> approved secondary containment for the filters under permit and inspection by the EHD. <br /> Open violations from April 24,2018 inspection <br /> Violation#121-Failed to submit a written response within 30 days of receiving an inspection <br /> report. <br /> An inspection was last done on March 21, 2017 and an inspection report was issued identifying <br /> information to be <br /> submitted to bring this site into compliance.This information was required to be submitted within <br /> 30 days of <br /> receiving the inspection report.This information has not been received resulting in a non- <br /> compliant status for this <br /> facility.An operator that receives an inspection report shall have 30 days to submit a written <br /> response that includes <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.