My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 8:57:40 AM
Creation date
6/23/2020 6:56:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 1 of 7 <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name:Anabi Shell Date of Testing:5/24/18 <br /> Facility Address:2375 W. Grant Line Rd., Tracy, CA 95377 <br /> Facility Contact:Manager Phone: <br /> Date Local Agency Was Notified of Testing:5/17/18 <br /> Name of Local Agency Inspector(f present during testing):Zuna Barker <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name:Dimaggio Maintenance <br /> Technician Conducting Test:Daniel Noone ICCO0261996 <br /> Credentials: NFCSLB Licensed Contractor ❑SWRCB Licensed Tank Tester <br /> License Type: A, B, Haz ILicense Number: 888681 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> Franklin Fueling Incon STS 7/25/19 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> 87 STP 1 ❑ ❑ ❑ UDC 11-12 C�' ❑ ❑ ❑ <br /> 87 STP 2 ❑ ❑ ❑ UDC 13-14 ❑ ❑ ❑ <br /> 89 STP 1 ❑ ❑ ❑ UDC 15-16 ❑ ❑ ❑ <br /> 89 STP 2 ❑ ❑ ❑ UDC 17-18 ❑ ❑ ❑ <br /> 91 STP 1 Wr ❑ ❑ ❑ UDC 19-20 ❑ ❑ ❑ <br /> 91 STP 2 J( ❑ ❑ ❑ UDC 21-22 ❑ ❑ ❑ <br /> Diesel STP i/ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 1-2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 3-4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 5-6 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 7-8 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 9-10 ❑ ❑ ❑ ❑ I ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Water was pumped into trailer storage tank and hauled off site back to the office. <br /> CERTIFICATI OF TECHNICI RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledg h fac(,stat e t s current are accurate and in full compliance with legal requirements <br /> YAP <br /> Technician's Signature: =M Z Date:5/24/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.