Laserfiche WebLink
SWRCB,January 2002 Page 4 of 7 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Incon Sump Tester Equipment Resolution:+/-.002 <br /> Sump#87 STP 1 Sump#87 STP 2 Sump#89 STP 1 Sump#89 STP 2 <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 80" 801, 80" 80" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 14ii 1 4ii 1 4ii 14 <br /> ii <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest llif 22ii ��If 2�n <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair Fair <br /> Portion of Sump Tested' 4"above highest 4"above highest 4"above highest 4" above highest <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes El No �NA ❑Yes ❑No /NA El Yes El No /NA ❑Yes El No SNA <br /> product and water ?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑Yes ❑No ^A ❑Yes ❑No 4(NA ❑Yes ❑No VNA ❑Yes ❑No ,/NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No ^A ❑Ye` ❑No �(NA ❑Yes ❑No /NA ❑Yes ❑No /NA <br /> operational?* <br /> Wait time between applying ® Min 13 Min 3 'n <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 10:02am 10:02am 10:37am 10:37am <br /> Initial Reading(RI): 4.9964 3.8519 3.7529 3.5893 <br /> Test End Time: 10:17am 10:17am 10:52am 10:52am <br /> Final Reading(RF): 4.9961 3.8515 3.7532 3.5889 <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-RI): .0003 .0004 .0003 .0004 <br /> Pass/Fail Threshold or Criteria: + -.002 +/-.002 +/-.002 +/-.002 <br /> Test Result: (Pass ❑Fail VPass ❑Fail Pass ❑Fail Pass ❑Fail <br /> Was sensor removed for testing? Yes ❑No ❑NA /Yes ❑No ❑NA /Yes ❑No ❑NA /Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑Yes ❑No VNA ❑Yes ❑No �!AL Yes ElNo JINA ElYes ElNo 4(NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />