My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 8:57:40 AM
Creation date
6/23/2020 6:56:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> SWRCB January 2002 Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer VIndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:4"Liquid-Filled Gauge Equipment Resolution:+/-.002 <br /> Piping Run#87 A Piping Run#87 B Piping Run#89 A Piping Run#89 B <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron Ameron <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 100' 100' 100' 100, <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Reducer Boots/Fitt Reducer Boots/Fitt Reducer Boots/Fit Reducer Boots/Fitt <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min 10 Min 10 Min 10 M i n <br /> starting test: <br /> Test Start Time: 9:00am 10:15am 11:30am 12:45pm <br /> Initial Reading(RI): 5.Opsi 5.Opsi 5.Opsi 5.Opsi <br /> Test End Time: 10:OOam 11:15am 12:30pm 1:45pm <br /> Final Reading(RF): 5.Opsi 5.Opsi 5.Opsi 5.Opsi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): None None None None <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable los: No detectable loss <br /> Criteria: <br /> Test Result: Pass ❑Fail Pass I p Fail ss,:; ❑Fail Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.