Laserfiche WebLink
S kRCB,January 2002 • • Page 1 of 7 <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(cf applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name:Anabi Shell Date of Testing:7/6/18 <br /> Facility Address:2375 W Grant Line Rd.,Tracy, CA 95377 <br /> Facility Contact:Manager Phone: <br /> Date Local Agency Was Notified of Testing :6/28/18 <br /> Name of Local Agency Inspector(fpresent during testing):Zuna Barker <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name:Dimaggio Maintenance <br /> Technician Conductin Test:Daniel Noone ICCO0261996 <br /> Credentials: VFCSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br /> License Type: A, B, Haz License Number: 888681 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> Franklin Fueling Incon STS 7/25/19 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> 87 A Secondary Product �( ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 89 A Secondary Product ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 91 A Secondary Product ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Diesel A Secondary Product ❑ V ❑ ❑ SEP 2.8 2018 ❑ ❑ ❑ ❑ <br /> 87 B Secondary Product ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 89 B Secondary Product ❑ ❑ ❑ ENVIRONMENTAL HEALTH ❑ ❑ ❑ ❑ <br /> 91 B Secondary Product ❑ ❑ ❑ DEPARTMENT ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> CERTIFICATI OF TECHNICI RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledg h facktat t s cument are accurate and in full compliance with legal requirements <br /> Technician's Signature: Date:7/6/18 <br />