My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
121
>
2300 - Underground Storage Tank Program
>
PR0232594
>
COMPLIANCE INFO_1992-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 12:53:22 PM
Creation date
6/23/2020 6:56:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2005
RECORD_ID
PR0232594
PE
2361
FACILITY_ID
FA0004573
FACILITY_NAME
SJ COUNTY PARKING GARAGE
STREET_NUMBER
121
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912001
CURRENT_STATUS
01
SITE_LOCATION
121 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232594_121 S SAN JOAQUIN_1992-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRO*MENTAL HEALTIDEPARTMENT <br />U" SAN JOAQUIN COUNTY <br />O p'• C <br />Donna K. Heran, R.E.H.S. <br />N Director 304 East Weber Avenue, Third Floor <br />Al Olsen, R.E.H.S.Stockton, California 95202-2708 <br />CgC'F,ORa�P Program Manager Telephone: (209) 468-3420 <br />Laurie A. Cotulla, R.E.H.S. <br />Program Manager Fax: (209) 464-0138 <br />October 1, 2003 <br />Tait Environmental Systems <br />3283 Luyung Drive <br />Rancho Cordova CA 95742 <br />Re: San Joaquin County Motor Pool Garage @ 121 San Joaquin Ave., Stockton <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />Your permit application to install a new vapor transition sump and sensor on the vapor recovery <br />line has been approved with the following conditions: <br />1. EHD must witness the soil sampling before the new transition sump is installed. <br />2. Contact EHD prior to backfilling the new vapor sump so that a 24 hour lake test can be <br />performed by this office. <br />3. A pressure and soap test must be performed by EHD on any installed piping. <br />4. Contact EHD for an inspection of the newly installed sensor prior to returning this facility <br />to operating conditions. <br />5. All piping and connections shall bear a UL label. <br />6. If ground is broken near the underground storage tank than, a tank integrity test must be <br />performed once this facility is returned to operating conditions. Results must be received <br />by this office within 7 days of completing the test. <br />7. Contact the local Fire Department and San Joaquin Valley Air Pollution Control District <br />for applicable permits and requirements. <br />8. Allow 48hour advance notice for scheduling inspections with this office. <br />If you have any questions please contact Michelle Le, Senior REHS at (209) 468-9847. <br />Thank you, <br />Michelle Le, Senior REHS <br />Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.