My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
121
>
2300 - Underground Storage Tank Program
>
PR0232594
>
COMPLIANCE INFO_1992-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 12:53:22 PM
Creation date
6/23/2020 6:56:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2005
RECORD_ID
PR0232594
PE
2361
FACILITY_ID
FA0004573
FACILITY_NAME
SJ COUNTY PARKING GARAGE
STREET_NUMBER
121
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912001
CURRENT_STATUS
01
SITE_LOCATION
121 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232594_121 S SAN JOAQUIN_1992-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul 01 03 11:33aT T Environmental System [ l 858-1011 <br />p.8 <br />VAVVK <br />toge 11 Vapor Pots from Westeln Fiberglass solve the problems associated with long piping <br />runs for vapor recovery and ve,it linos. Vo1,or pots are +-sed when sufficient piping fail or .elope <br />is not possible due to rhe lengill of a pipe run or because of site grade. <br />Vapor pot4 are available in single or double wall construction to satisfy local regulations <br />or requirements and are CARO listed, Orientation cnn he vertical nr hariiFantol <br />will, inspection access openings (bungs) installed for manual or <br />automatic: Rvacuation and/or testing. <br />Piping manifolds are easily attached <br />through slondard 1", 2" or 3" FRP <br />NPT threaded couplings --- faclory <br />installed diming maunufacturing. <br />Custom designed and configured <br />vapor recovery pots can bo built <br />to your specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.