Laserfiche WebLink
SWRCB. January 2002 <br />6. PIPING SUMP TESTING <br />Page 4 of 7 <br />Test Method Developed By: [ ] Sump Manufacturer [ X ] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [ ] Pressure [ ] Vacuum [X ] Hydrostatic <br />Other (Specify) <br />Test Equipment Used: CALDWELL LEVEL GAUGE Equipment Resolution: 0.025 <br />Sump # <br />Sump # Sump # <br />Sump Diameter: <br />42 INCH <br />Sump Depth: <br />48 INCH <br />Sump Material: <br />FIBERGLASS <br />Height from Tank Top to <br />14 INCH <br />Top of Highest Piping <br />Penetration: <br />Height from Tank Top to <br />Lowest Electrical <br />24 INCH <br />Penetration: <br />Condition of sump prior to <br />DRY <br />testing: <br />Portion of Sump Tested <br />25 INCH <br />Does turbine shut down <br />[X] YES [ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />when sump sensor detects <br />[ ] NA <br />[ ] NA <br />[ ] NA <br />liquid (both product & <br />water)? <br />Turbine shutdown response <br />time: <br />30 SECONDS <br />Is system programmed for <br />[X] YES [ ] NO <br />[ ] YES[ ] NO <br />[ ] YES [ ] NO <br />fail-safe shutdown? <br />] NA <br />NA <br />rjNA <br />Was fail-safe verified to be <br />[X] YES [ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />operational? <br />f I NA <br />NA <br />NA <br />Wait time between applying <br />pressure/vacuum/water and <br />FIVE MINUTES <br />starting test: <br />Test Start Time: <br />10:20 A.M. 1-21-03 <br />Initial Reading (Rl): <br />25 INCH <br />Test End Time: <br />11:20 A.M. 1-21-03 <br />Final Reading (Rf): <br />25 INCH <br />Test Duration: <br />ONE HOUR <br />Change in Reading (Rf-R1) <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />[XI PASS FAIL <br />PASS I FAIL <br />PASS FAIL <br />Was sensor removed for <br />[X] YES [ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />testing? <br />[ NA <br />NA <br />NA <br />Was sensor properly <br />[X] YES [ ] NO <br />replaced and verified <br />[ ] N/A <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />functional after testing? <br />[ N/A <br />[ ] N/A <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />MADE REPAIRS TO ELECTRICAL CONDUIT. RESEALED ALL PIPING AND <br />ELECTRICAL PENETRATIONS <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (°) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />