Laserfiche WebLink
SWRCB. January 2002 <br />n <br />9. SPILL/OVERFILL CONTAINMENT 1103CFN <br />Page 7 of 7 <br />- --------- <br />Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br />Spill/Overfill Containment Boxes are Present, but were Not Tested [ <br />Test Method Developed By: [ ] Spill Bucket Manufacturer [ ] Industry Standard [ ] Professional Engineer <br />Other (Specify) <br />Test Method Used: [ ] Pressure [ ] Vacuum [X ] Hydrostatic <br />Other S eci ) <br />Test Equipment Used: Equipment Resolution: <br />Spill Box # Spill Box # Spill Box# <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between <br />applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (R1): <br />Test End Time: <br />Final Reading (RO: <br />Test Duration: <br />Change in Reading (Rf-RI) <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result- [ [ Pass [ 1 Fail ] ] Pass [' ]Fail [ ] Pass [ ] Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />