Laserfiche WebLink
A APPLICANTjAILLING NAME <br />P STOKLEY CONSTRUCTION <br />P <br />MAILING ADDRESS <br />C P.O. BOX 1008 <br />A <br />T CITY TRACY, CA. <br />Ll <br />APPLi T;TACT <br />1 U y �T3p � LTH AREA CODE <br />STATE2IP CODE TYPE of APPLICATION <br />CA. 5378-100 CLOSURE, INSTALLATION, etc. INS <br />PERMANENT CLOSURE (Removat or Authorized Closure -in -Plaice) <br />TOTAL <br />L CLOSURE FEE _ $53.00 per hour (3 hours minimum per TANK) <br />A <br />$ <br />1986 1987 1 1988 1 1989 1990 <br />T ANNUAL FACILITY FEE (Prior to January 1, 1991) _ $100.00 <br />$ <br />I <br />E\ TEMPORARY CLOSURE FEE _ $150.00 each TANK <br />E TANK FEE _ $50.00/TANK (prior to January 1,1991) <br />$170/TANK (after January 1, 1991) <br />F 0 Tanks = 1986 1987 (988 1989 <br />1990 1991 1992 1993 1994 1995 1996 <br />A (mtuttiply W -FY -foe for <br />$ <br />C each year applicable) <br />L STATE SURCHARGE a $56.00 each TANK (Dux every 5 years) <br />See Catifornis H & S Code, Section 25287 <br />T # Tanks x $56.00 1986 through 1990 <br />1991 through 1996 <br />Y (enter amount and year) <br />$ 56. <br />PERMANENT CLOSURE (Removat or Authorized Closure -in -Plaice) <br />TANK I.D. #(s) <br />L CLOSURE FEE _ $53.00 per hour (3 hours minimum per TANK) <br /># TANK(s) X $159.00 = <br />$ <br />0 <br />U, TEMPORARY CLOSURE (A one-time permit, for review/inspections) <br />TANK I.D. #(a) <br />E\ TEMPORARY CLOSURE FEE _ $150.00 each TANK <br /># TANK(s) X $150.00 = <br />S <br />P PLAN CHECK (Install. Pian Review & Construction Inspections) <br />TANK I.D. #(s) <br />L <br />N PLAN CHECK FEE - $53.00 per hour (8 hours minimum per Facility) <br />_ $424.00 minimum <br />=--424-.0 <br />R REPAIR FEE (workplan review & construction inspections) <br />TANK I.D. #(s) <br />R TANK REPAIR FEE _ $53.00 per hour (3 hours minimum/TANK) <br /># TANK(s) X $159.00 = <br />f <br />A <br />R PIPING REPAIR FEE _ $53.00 per hour (3 hour minimum per facility = $159.00) <br />$ <br />M TRANSFER FEE = $20.00 UNAUTHORIZED RELEASE EVALUATION = $53.00/hr <br />$ <br />I <br />Cl CONSULTATION FEE = $53.00/hr SAMPLING INSPECTION FEE <br />_ $53.OA/hrF - <br />TOTAL DUE /A $650 .00 <br />EH 23 032 (REV 4/8/91) ft <br />L <br />