My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
121
>
2300 - Underground Storage Tank Program
>
PR0232594
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 3:21:31 PM
Creation date
6/23/2020 6:56:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0232594
PE
2361
FACILITY_ID
FA0004573
FACILITY_NAME
SJ COUNTY PARKING GARAGE
STREET_NUMBER
121
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912001
CURRENT_STATUS
01
SITE_LOCATION
121 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232594_121 S SAN JOAQUIN_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.. <br /> , <br /> ` I)NIFIED PROGRAM CONSOLIDATED FOAk <br /> UNDERGROUND STORAGE TANK p <br /> MONITORING PLAN- Pse I of 2) CC <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 4 <br /> 490 <br /> Of <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. ago-z <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I - - I <br /> BUSINESS NAME(Same as FACILITY NAME) SMJ j M a(jiN "D dµJOh A} IAl& G, E 3. <br /> BUSINESS SITE ADDRESS J.- ) s . S,4,A) 1 �� r to3. CITY G • toa. <br /> ` H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY [199.OTHER(Specify): 490-3aPe �)� 4900b <br /> -36 <br /> M.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-0 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: [fa.DRY ❑ b-LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> --- ------ -- ------ ------------ -- - <br /> ------------------------------------------------------------- _ <br /> 490-7, i . <br /> PANEL_MANUFACTURER:-/ IQ�Q - - - MODEL# y <br /> _ LtS_- d------------------ago---- <br /> LEAK SENSOR MANUFACTURER: t 490-9. i MODEL#(S): 49040 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> - ---------------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14' MODEL#(S): 490-15 <br /> --------------------------- ---------------------------------------- ------------------------------------------------------------------------------------------ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> --------------------------------------------------------------------------------------------------------------- <br /> PROGRAMMED TESTS: a.0.1 h. ❑ b.0.2 h. c.OTHERS ci 490-19 <br /> ❑ g R g�P ❑ (Specify): a90-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS El b.60 HOURS 49900-22 <br /> 5-TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> 90-24 <br /> TEST FREQUENCY: Ela.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 4990 z5 <br /> ❑99.OTHER (Specify): 490-26 <br /> ago-z7 <br /> V.PII'E MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) � <br /> SECONDARY CONTAINMENT IS:51 a.DRY [:Ib.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> - -- -------------------------------- <br /> PANEL MANUFACTURER: K9, D01 490-3°i MODEL#: 49°-31 <br /> LEAK SENSOR MANUFACTURER: ago-32 MODEL#(S): Q4v°-33 <br /> ------- -- -- S--------------......... <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636) __ ___--___- 490-36 <br /> MLLD MANUFACTURER(S): VIA POA490-37 MODEL#(S): 1717 ZA ?DOD <br /> 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS (23 CCR§2636) 490-39 <br /> --- ---- ------- ----- <br /> 4900--------------------------------------- <br /> 490-40. -41 <br /> ELLD MANUFACTURER(S) MODEL#(S)_ - ---_________ <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-0-2 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 49043 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS i 4904649047 <br /> 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049 <br /> •Allowed for monitoring of unburied emergency fud pipingonly perBSC 25281. 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA]23 CCR§2636(a)(3)]. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> ago-51 <br /> ❑ 99.OTHER(Specify) LL Rfbj-&jifM S a 490-53 <br /> e 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.