Laserfiche WebLink
SWRCB, January 2002 Page of <br />Secondary Containment Testing Report Form AUG 2015 <br />This form is intended for use by contractors performing periodic testing of UST secondary containment sygWRONWWAL HEALTH <br />appropriate pages of this form to report results for all components tested. The completed form, written test prd?NWISOVICES <br />printouts from tests (tf applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: San Joaquin County Downtown Garage Date of Testing: July 27, 2015 <br />Facility Address: 121 South San Joaquin Street, Stockton, Ca. 95202 <br />Facility Contact: Connie Worden I Phone: (209) 468-2068 <br />Date Local Agency Was Notified of Testing: 6/10/2015, by Afford -A -Test <br />Name of Local Agency Inspector (f present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: R&D Compliance Testing <br />Technician Conducting Test: Benjamin F. Duncan Jr. <br />Credentials: ❑ CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br />License Type: Tank Tester License Number: 90-1120/ICC#5246802-UT <br />Manufacturer TraininE <br />Manufacturer Component(s) Date Training Expires <br />Caldwell Systems Piping Sum s/UDC's July, 2017 <br />3. SUMMARY OF TEST RESULTS <br />Component Pass Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not Repairs <br />Tested Made <br />Annular Tank #1 X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Secondary Pipe #1 X ❑ <br />0 <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Secondary Pipe #2 X 1 0 <br />❑ <br />1 ❑ <br />❑ <br />❑ <br />❑ 1 ❑ <br />Secondary Pipe #3 X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ I ❑ <br />Secondary Pipe #4 X ❑ <br />0 <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Secondary Pipe #5 X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Secondary Pipe #6 X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Piping Sump #1 X ❑ <br />❑ <br />I ❑ <br />❑ <br />❑ <br />❑ ❑ <br />Piping Sump #2 X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Piping Sump #3 X 0 <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Dispenser Sump #1 X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Dispenser Sump #2 X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: Date: July 27, 2015 <br />