Laserfiche WebLink
Monitoring System Certification 0 0 <br />UST Monitoring Site Plan <br />Site Address: 121 S. SAN JOAQUIN ST STOCKTON CA. <br />.................................................................. <br />.................................................................. <br />.................................................................. <br />.................................................................. <br />KEY <br />...... O O........................I................. <br />A=ANNULAR <br />.............................................. <br />F=FILLS <br />........................................................ <br />T=TURBINE <br />....................................................... <br />P=PROBE <br />V = VAPOR <br />X = SUMP SENSOR <br />L = PLLD <br />SAN JOAQUIN STREET <br />Date map was drawn:7/28/11. <br />M = Manway <br />B = Brine Sensor <br />I= Smart Sensor <br />S = STP <br />C = Floats & Chains <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />