Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.s04ov.orq/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br />Facility <br />San Joaquin Parking Garage <br />Facility 121 S. San Joa uin, Stockton <br />q <br /># C1 C2 M Code Section <br />Daeection Jul 18, 2014 <br />Name: <br />Address: <br />101 HSC 25284 <br />No permit to operate <br />Facility <br />CAL000295835 <br />Annual operating fees not paid <br />Title: <br />Fleet Manager <br />No written agreement between the person that the operating permit was issued to and the tank operator to <br />h <br />-S1D6/ 8-2180 <br />Contact: <br />104 HSC 25292.2 <br />Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />105 CCR 2711 <br />Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) <br />Inspection X Routine XMonitoring System Certification ❑ Installation ❑ Complaint— ID#: <br />Type: <br />❑ Other: <br />(Authority HSC 25289) <br />Connie Worden <br />Title: Motor Pool Dispatch <br />Consent for: gQlnspection Sampling $Photos <br />Granted by: <br />not provided to the EHD at least 48 hours prior to conducting the test <br />Monitoring t TLS <br />-350 d <br />Panel: Veeer-oo-350 <br />Plping <br />System: <br />Pressurized ❑Suction F1 Gravity <br />Overfill <br />Prevention: <br />Mechanical ❑Audible/visual <br />UST <br />1 <br />_---------_--- <br />-------_----- <br />Annual spill containment testing not performed <br />-_---_- <br />Annual line tightness test not performed if positive shutdown or fail safe not present (M1) <br />113 CCR 2715(a) <br />Failed to inform the EHD of a change of designated operator within 30 days <br />114 CCR 2715(b) <br />Designated operator does not possess a current ICC CA UST System Operator certification <br />115 CCR 2660(k) <br />---Product-- <br />--87-octane-- <br />permit conditions <br />Enhanced leak detection (ELD) testing not performed on a system located within 1000' of public well, or <br />116 HSC 25292.5 <br />failures not repaired and retested <br />117 CCR 2661 <br />Permit to repair UST system not obtained <br />118 HSC 25286(a) <br />Operational permit not amended when UST storage and/or monitoring system changed <br />119 HSC 25298(b) <br />Designated signatICC Exp. <br />Jesse Berumen8014628Date: <br />7/25/14 <br />Violations: -1 M1 -Release Detection <br />M2 -Release Prevention M3 — Both <br />11❑ <br />O <br />O <br />performance claims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />201 CCR 2712(b) <br />Site Service ICC Exp Manufacturer's <br />FeliXRamlrez5273934 � 12/6/14 Training: VR B34975 7/7/16; <br />VMI 2529 11/12/15 <br />Te Date: <br />Technician: <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />Inspector: eived By: Title: <br />Jeffrey Wong (209) 468-0335 <br />EHD 23-02 Rev 04/19/12 Page 1 UST INSPECTION REPORT <br />VIOLATIONS <br /># C1 C2 M Code Section <br />HSC = California Health and Safe Code; CCR = Carrfomia Code of Regulations <br />C1 = Class 1 violation; C2 = Class 2 violation; M = Minor violation <br />101 HSC 25284 <br />No permit to operate <br />102 HSC 25404.5 <br />Annual operating fees not paid <br />No written agreement between the person that the operating permit was issued to and the tank operator to <br />103 HSC 25284(a)(3) <br />monitor the tanks stem <br />104 HSC 25292.2 <br />Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />105 CCR 2711 <br />Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) <br />106 CCR 2632(b) <br />Monitoring Program (Monitoring & Response Plans) is not current or approved by the EHD <br />107 CCR 2632(d)(1)(C) <br />Plot plan/site map not submitted or fails to completely show where monitoring is performed <br />Secondary containment: (a) test not performed; (e) test report not submitted within 30 days; (f) test notification <br />108 CCR 2637 <br />not provided to the EHD at least 48 hours prior to conducting the test <br />Monitoring equipment certification: (a) not performed annually; (d) test report not submitted within 30 days; <br />109 CCR 2638 <br />(e) test notification not provided to the EHD at least 48 hours prior to conducting an installation, repair, <br />replacement, calibration, or certification <br />110 HSC 25291 (0 <br />Annual line leak detector test not performed (M7) <br />111 HSC 25284.2 <br />Annual spill containment testing not performed <br />112 CCR 2636(f)(4) <br />Annual line tightness test not performed if positive shutdown or fail safe not present (M1) <br />113 CCR 2715(a) <br />Failed to inform the EHD of a change of designated operator within 30 days <br />114 CCR 2715(b) <br />Designated operator does not possess a current ICC CA UST System Operator certification <br />115 CCR 2660(k) <br />Repair for tank or piping not tested for tightness after completion of the repair pursuant to (M2) <br />permit conditions <br />Enhanced leak detection (ELD) testing not performed on a system located within 1000' of public well, or <br />116 HSC 25292.5 <br />failures not repaired and retested <br />117 CCR 2661 <br />Permit to repair UST system not obtained <br />118 HSC 25286(a) <br />Operational permit not amended when UST storage and/or monitoring system changed <br />119 HSC 25298(b) <br />Permit to temporarily dose UST system not obtained <br />120 HSC 25298(c) <br />Permit to close UST system not obtained <br />,. ..�: <br />Maintenance & monitoring records not maintained 3 years, cathodic protection records for 6'h years, written <br />performance claims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />201 CCR 2712(b) <br />upgrades for the life of the tank. Monitoring records include: (1) date and time of all monitoring or sampling; <br />(2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, round water elevations, or other test results; 6 results of inventory readings and reconciliations <br />202 CCR 2712(i) <br />Monitoring plan, response plan, and/or operating permit and all conditions not onsite <br />Unauthorized release that: (c) did not escape secondary containment and cleaned up within eight hours (M1) <br />203 CCR 2650 <br />was not recorded; (e) escaped secondary containment, not cleaned up after eight hours, or a sudden loss of <br />product was not reported to the EHD within 24 hours <br />Inspector: eived By: Title: <br />Jeffrey Wong (209) 468-0335 <br />EHD 23-02 Rev 04/19/12 Page 1 UST INSPECTION REPORT <br />