Laserfiche WebLink
Monitoring System Certification s ", ' <br />REG <br />�EI <br />r"D <br />UST Monitoring Site Plan <br />Site Address: SAN JOAQUIN DOWNTOWN GARAGE 121 S. SAN JOAQUIN ST. STOCKTON CA 95202 j U L s Z1 7 <br />........................................... <br />.................................................................. <br />.................................................................. <br />..... ..................................... <br />I .......... I........... <br />KEY <br />A = ANNULAR <br />. . . . . O O <br />. . . . . . . <br />F = FILLS <br />....................................... <br />T=TURBINE <br />...................... <br />P=PROBE <br />....................................................... <br />V = VAPOR <br />X = SUMP SENSOR <br />L = Leak Detector <br />M = Manway <br />SAN JOAQUIN STREET <br />Date map was drawn: 7-24-17 <br />B = Brine Sensor <br />I = Smart Sensor <br />S = STP <br />C = Floats & Chains <br />E = E Stop <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />