My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2000-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:31:54 PM
Creation date
6/23/2020 6:56:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2007
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2000-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•„ • •111111111 1 11 TroTt <br />With a reduced piston size, there is one-fourth the volume to replace when in leak search and one-fourth the <br />volume to return to the line when the pump turns off. This combination makes for a more responsive and <br />faster leak detector. Less volume to leave the line for the leak detector to reset and catch leaks. Less volume <br />to fill and provide full flow for dispensing! <br />The reduced surface area of the piston significantly reduces the surface area exposed to hydraulic line <br />shock. This results in enhanced performance with steel and fiberglass pipe, and especially with today's <br />flexible pipe. <br />In the early 1990's, the first commercially successful flexible pipe, Total Containment PP -1500, was introduced <br />to the U. S. petroleum industry. Due to the flexibility of this pipe system, no line leak detection would work. <br />In 1992, the VMI LD -2000\E was certified for 3 GPH @ 10 psi on Total Containment PP -1500 pipe. The <br />99 LD -2000\E is still required for existing PP -1500 pipe. Additionally, today the 99 LD -2000\E is used in <br />sites that have the same line characteristics as the LD -2000\E was originally certified for, even though the <br />pipe is different. The original certification of the LD -2000\E concerned the bleed -back modulus of PP - <br />1500 pipe. Today, lines with high bleed -back (generally above 600 ml.) and high head pressure may <br />require the 99 LD -2000\E to pass a field test for annual certification. Consult with factory before ordering <br />and installing the 99 LD -2000\E. <br />The 99 LD -2000 is compatible with the ARM -4073, ISM -4080 and ISM -4081. The ARM and ISM modules <br />are able to eliminate thermal inducted slow flow at a site. The ISM modules will provide submersible shutdown <br />at the detection of a leak and site monitoring interface or alarm notification. Read about the benefits of these <br />devices on our web site, request a product brochure or talk to one of our sales staff. <br />The 99 series leak detectors are the lowest profile leak detectors available today. <br />
The URL can be used to link to this page
Your browser does not support the video tag.