Laserfiche WebLink
RECEIVED <br />JUN 2 7 <br />B, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill con m and <br />printouts from tests (f applicable), should be provided to the facility owner/operator fo it l tory agency. <br />1. FACILITY INFORMATION <br />Facility Name: MIRAMIR ENT. I Date of Testing: 05-20-14 <br />Facility Address: 1605 S EL DORADO ST STOCKTON CA <br />Facility Contact: ANGLE Phone: 209-939-1906 <br />Date Local Agency Was Notified of Testing :04-14-14 <br />Name of Local Agency Inspector (if present during testing): SAN JOAQUIN CO STACY <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 nd Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ vacuum ❑ Other <br />Test Equipment Used: TAPE / H2O Equipment Resolution: 1/16 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 87 <br />2 91 <br />3 <br />4 <br />Bucket Installation Type: <br />® Direct Bury <br />❑Contained in Sump <br />®Direct Bury <br />❑Contained in Sump <br />❑ Direct Bury <br />El Contained in <br />Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sum <br />Bucket Diameter: <br />11 <br />11 <br />Bucket Depth: <br />14 <br />14 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (Ti): <br />1030 <br />1030 <br />Initial Reading (RI): <br />14 <br />14 <br />Test End Time (TF): <br />1130 <br />1130 <br />Final Reading (RF): <br />14 <br />14 <br />Test Duration (TF — Tj): <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF - RI): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />® Pass ❑ Fail <br />E Pass ❑ Fail <br />❑ Pass: ❑ Fail <br />❑ Pass Q Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />OPW BUCKETS <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: fir Date: 05-20-14 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />