My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: J UDC Manufacturer Industry Standard X Professional Engineer <br />Other (Specify) <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />UDC # 1&2 <br />UDC # 3&4 UDC # 5&6 UDC # <br />UDC Manufacturer: <br />Bravo <br />Bravo Bravo <br />UDC Material: <br />Coated Steel <br />Coated Steel Coated Steel <br />UDC Depth: <br />9" <br />9" 9" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Enters from bottom <br />Enters from bottom Enters from bottom <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Enters from bottom <br />Enters from bottom Enters from bottom <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry Dry <br />Portion of UDC Tested' <br />Water Line 7" <br />Water Line 7" Water Line 7" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and waterp. <br />No <br />No No <br />Turbine shutdown response time <br />N/A <br />N/A N/A <br />Is system programmed for fail- <br />safe shutdown?* <br />Yes <br />Yes Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />No No <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />5 Minutes 5 Minutes <br />Test Start Time: <br />9:10 <br />9:05 9:00 <br />Initial Reading (RI): <br />.001 <br />.001 .001 <br />Test End Time: <br />9:40 <br />9:35 9:30 <br />Final Reading (RF): <br />.001 <br />.001 .001 <br />Test Duration: <br />30 Minutes <br />30 Minutes 30 Minutes <br />Chane in Reading (RF -RI): <br />0 <br />0 0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes .005/30 Minutes <br />Test Result: <br />Pass <br />Pass Pass <br />Was sensor removed for testing? <br />No <br />No No <br />Was sensor properly replaced and <br />verified functional after testing? <br />N/A <br />N/A N/A <br />Comments — (include information on repairs made prior to testing, and <br />�! E T .I r i <br />e E RA .Ftfkl am.4 1 T <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a� of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.