Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />ElCheck this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />® Yes <br />❑ <br />No <br />Has all input wiring been inspected for proper entry and termination, including testing for rn faults? g ou d a ts? <br />® Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />jUN 18 2e <br />® Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />® Yes <br />® Yes <br />ElNo* <br />ElNo* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was accuracy of system water level readings tested? <br />1%01 VIV11— <br />Were all probes reinstalled properly? t iI a1 r J rNCOA074Rem 0 <br />® Yes <br />1 ❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- in aecuon n, oeiow, oescrme now ano when mese oenciencies were or winoe correuteu. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />r....,..�see etre 6*11...*.:n.. n6en41i�.e• <br />® <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ <br />N/A <br />Simulated leak rate: ® 3 g.p.h.; El0.1 g.p.h; El0.2 g.p.h. <br />® <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />® <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />ElYes <br />[INo* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® <br />N/A <br />❑ <br />Yes <br />ElNo* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />N/A <br />® <br />Yes <br />171No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />87 120 4 27 21 PASS <br />91 130 4 32 22 PASS <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />