Laserfiche WebLink
13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. >c <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br />4 <br />.r <br />UST <br />SYSTEM PRINTSET INFORMATION <br />!' y <br />J►� , ;ifs, �, <br />.r ` I% <br />1. <br />ur complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />2. <br />3. <br />Plans drawn to scale in non -erasable print. <br />Plot plan to show location and number of tanks. <br />4. <br />LX <br />Tank cross-sectional diagram included on prints submitted. <br />0 "INA <br />5. <br />CORROSION PROTECTION <br />Detail of tank, piping system, excavation and cover. <br />6. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br />Article 3, Sec. 2631 (r) & 26351 <br />7. <br />.. <br />Verification of product compatibility with the tank(s), piping, monitoring <br />�� <br />a <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />8. <br />Manufacturerls written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br />9. <br />ightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br />— <br />[Section 2635 (b) (6) & (7)] <br />10. <br />mon'tor the annular s e. Section 2635 (b) (7) <br />D utile aped anks,using or vac testi �nsta <br />11. <br />NFP 329 "Precision Test0o r i upon completion of llation wi tank in operating condition. T t results to <br />be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)] <br />17_ <br />TANG COIMOSITION <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. >c <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br />4 <br />.r <br />CAPACITY —■,.. <br />!' y <br />J►� , ;ifs, �, <br />.r ` I% <br />MANUFACTURER <br />` r / r► <br />�. r SII <br />j <br />0 "INA <br />CORROSION PROTECTION <br />LISTEDCOMPOSITION <br />COMPATIBILITY11 <br />METHANOL <br />.. <br />_. .... .... .._. <br />�� <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. >c <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br />4 <br />