Laserfiche WebLink
JAN-1-2002 04:19P FROM: T :12094683433 P:6/8 <br /> F. in-Tank Gauging/SYR Equipment: Iff Check this box if tank gauging is used only for inventory control. <br /> Cl Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank g$tiging equipment is used to perform leak detection monitoring. <br /> Complete the followin checklist: <br /> ❑ Yes ❑ No* Iias all input wiring;been in ted for proper entry and termination.including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ Not- Was accuracy of system produ�:, level readings tested? <br /> U Yes ❑ No* Was accuracy of system water 1�!vel readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Xes ❑ No* Were all items on the cquipmeit manufacturer's maintenance checklist completed? <br /> * <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line i.eatk Detectors(LLD): Q Ct,mk.this box if L,L.ns are not installed. <br /> Com lets the following checklist: <br /> L'l Yes U No* For equipment start-up or angital equipment "wtitication, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulat;,d leak rate: ❑i g.p.h.; ❑0.1 g,p.h; ❑0.2 g.p.h_ <br /> ❑ Ycs Q No Were all LLDs confirmed oper;t tional and accurate within regulatory requirements? <br /> ❑ Yes 1 ❑ No* Was the testing apparatus prorxrly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does thl LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs.does the tarbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> U Yes U No* For electronic LLDs,does the ti trbinc automatically shut off if any portion or the monitoring;system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does --I;e turbine Automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or faits a test'.? <br /> ❑ Yes ❑ No* For electronic LLDs,have all a;ecssible wiring connections been visually inspected'? <br /> ❑ N/A <br /> U Yes ❑ No* Were all items orf the cQuipm=I manufacturer's maintenance checklist eompleted'l <br /> "In the Section H,below,describe how and whit these deficiencies were or will be corrected. <br /> Fk. Comments- <br /> Page 3 of 3 ort <br />