My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:24:55 PM
Creation date
6/23/2020 6:56:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2004
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2002-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Customer <br />DIALYSIS NORTH � <br />Date Location Product <br />'7-2A; -o y Iso I 7.gc,r 7.6- 41 . 7;; -,e 3 <br />Technician T® P1SPcTar.r4rsjeS 2!0-7 <br />6 -RL -6- 1WA A_7-^ A-%1 <br />Submersible Pump Identification <br />Manufacturer Model No. Serial Number <br />Leak Detector Identification <br />Manufacturer Description Other Style Leak Detector <br />r E . PE i2o <br />STP—ML 1.-11 SenlA�OZ/0L5yg <br />Diaphragm -type <br />Piston -type X. <br />Leak Detector in Submersible Pump <br />Test at Dispenser <br />1. Operating Pump Pressure 3 psi (Purging Test System) <br />2. Gallons per hour rate 3 (Leak Test Phase 1) <br />3. Line pressure with pump shut off 3 `f psi (Leak Test Phase 1) <br />4. Bleedback Test with pump off 24,5 ml (Bleed -back Test) <br />5. Step -through time to full flow • 3 7 seconds (Step -through Time) <br />6. Leak detector stays in leak search position. (Leak Test Phase 2) Yes No <br />LEAK DETECTOR TEST <br />Note: Pass = Leak detector stays m slow flow during GPH test <br />Fail = Leak detector steps through to allow full pump pressure during GPH test <br />Pass <br />Fail <br />*Complete thermal expansion test before failing leak detector. <br />Form 890C (May 9, 2002) <br />2002 Vaporless Manufacturing, Inc., Prescott Valley, AZ DIALYSIS NORTH <br />P.O. Box 95 <br />Bella Vista, CA 96008 <br />(530)275-6667 <br />
The URL can be used to link to this page
Your browser does not support the video tag.