Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> MO ORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mso. <br /> ET 1.CONTINUOUS ELECTRONIC MONITORI GOF UNDER DISPENSER CONTAINMENT(UDC) T <br /> PANEL MANUFACTURER: — p M"- MODEL#: l LS - 3fSD M51 <br /> LEAK SENSOR MANUFACTURER: L -L M54. MODEL#(S): [ — Z)_ M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? a.}ES ❑ b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.,YES C3 b' <br /> NO M55. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? Va.YES Elb.NO M57. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> /ASSEMBLY MANUFACTURER: M" MODEL#(S): Mss. <br /> 3.VISUAL MONITORING DONE: a.DAILY El b.WEEKLY(Requires agency approval) M60 <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK Myo. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> REFERgNCIE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mao. <br /> 1. ( IS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. „OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. P E FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. LIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> T ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): M81. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> A Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mas. <br /> AS OF 1/1/05, THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION- <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR 2715(b). <br /> RTIFICATI rtify at information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/ONE T RSI TU REPRESENTING DATE: M91. <br /> ❑O r M90. !, <br /> Di perator U <br /> OWNER/OPE E / I /� 0 <br /> rint): Msz. OWNER/OPERATOR TITLE: M93. <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />