Laserfiche WebLink
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location: i to i I�-rnA ti <br /> Owner: .c Phone No: <br /> Contractor: Phone No:-5 <br /> License No: <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that <br /> one of the following materials was placed in the excavation in 12" lifts: <br /> �o A. Pea gravel--smooth, rounded material not more than one-half (1/2) <br /> inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters <br /> ,314 inch in cross sectional measurement. (Use of crushed rock will <br /> not �e permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar <br /> materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> ofroject completion, or submission of verification that the select material described above <br /> will placed at a minimum of five (5) cubic yards per 1000 gallon tank di%acement and <br /> that the entire excavation will be backfilled and compacted to insure comp ance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> *Naft;ie­(Pfl_nt)___ <br /> I i"e Print) <br /> i S�gn a�ur e <br /> Shall be the responsible managing employee on the license or authorized agent. <br />