Laserfiche WebLink
- <br /> 2 3 4 a a 7 8 9 10 n 12 13 14 15 tO 17 is <br /> ROUTE t' <br /> TUBING <br /> M OVERHEAD <br /> ' — - - EXISTING DOUBLE WALL FIBERGLASS PRODUCT PIPING M <br /> NEW HEAY CLEAN AIR ------------ EXISTING SINGLE WALL FIBERGLASS VAPOR RETURN PIPING <br /> SEPARATOR TANK ON <br /> CONCRETE PAD W/ — — — — EXISTING SINGLE WALL FIBERGLASS VENT PIPING <br /> BOLUARDS <br /> NEW DOUBLE WALL FIBERGLASS PRODUCT PIPING <br /> '1 , <br /> EXISTING VENT RISERS ------------ NEW SINGLE WALL FIBERGLASS VAPOR RETURN PIPING <br /> -' <br /> L \� N <br /> L <br /> 10' 0 to' o• 30' <br /> GENERAL NOTES <br /> 1 <br /> y <br /> GRAPHIC SCALE 1"- 10'--0' NOTE: <br /> CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE CHAT THE OPERABLE SYSTEM MEETS THE DESIGN <br /> K ``11� INTENT AND THE CONTRACTOR IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD <br /> CONDITIONS AND INSTALLATION TECHNIQUES. K <br /> it <br /> 1 <br /> EXISTING VENT INSTALLA110N NOTES <br /> - <br /> PIP14G TO REMAIN <br /> EXISTING LPG Oj EXISTING DISPENSERS TO BE RETROFITTED WITH NEW INCON ;SD SENSORS, FOR <br /> ;;`� • • ABOVE-GROUND <br /> STORAGE TANK PHASE II EVR COMPLIANCE. <br /> J EXISTING UNDERGROUND <br /> STORAGE TANKS TO O2 INSTALL NEW INCON TS-EMS ISD MONITORING SYSTEM PANEL, CONNECTED TO J <br /> REMAIN EXISTING OMNTEC TANK MONITOR IN BUILDING. CONTRACTOR TO FOLLOW CARE <br /> EXECUTIVE ORDER VR-202-F, IOM MANUALS, AND MANUFACTURERS <br /> t NEW PRODUCT AND VAPOR SPECIFICATIONS. <br /> 1 PR00 GAI�O-O PIPING SECTIONS <br /> — _ (�p1 INSTALL(a) NEW BLEND O3 CONTRACTOR TO INSTALL A NEW HEALY CLEAN AIR SEPARATOR TANK AT LOCATION <br /> _ <br /> =/ DISPENSERS SHOWN, AND CONNECT TO EXISTING VENT RISERS, FOR EVR PHASE 11 COMPLIANCE. <br /> O ; I O INSTALL NEW PIPE BOLLARDS FOR CRASH PROTECTION AS REQUIRED. <br /> a ~ - (3.0) ® CONTRACTOR TO INSTALL NEW INCON ISD MONITORING FLOW METERS AT EACH H <br /> EXISTINGAP TURBINE �,,12,0�O.'�% ii O GASOLINE DISPENSER, AND NEW PRESSURE SENSOR AT ONE DISPENSER FOR <br /> 3++ EXISTING GAS PHASE 11 EVR W/ ISD COMPLIANCE. <br /> O_,O—- - - 3+t DISPENSERS TO BE <br /> `+ — UPGRADED <br /> II <br /> I (3 0) OS CONTRACTOR TO PULL NEW SENSOR WIRING THROUGH EXISTING CONDUITS <br /> �O <br /> 11 O INSTALL PRESSURE a+D 3+,1 © CONTRACTOR TO INSTALL NEW HEALY PUMPS AND HANGING HARDWARE A7 EACH <br /> 12UNL.GAL <br /> I SENSOR HERE 0+0 EXISTING GASOLINE DISPENSER, PER LATEST EXECUTIVE ORDER VR-202. <br /> O DNL111 l ® O7 INSTALL (2) GILBARCO ENCORE 3+1 PRODUCT (SINGLE SIDED} & (2) GILEARCO Q <br /> POINT Of <br /> ' I i CONNECTION <br /> I I I I I ENCORE 3+0 PRODUCT (DUAL SIDED) BLEND DISPENSERS AS SHOWN. <br /> 8 III 1 i I I DISPENSERS TO BE FITTED WITH "HEALY" VAPOR ASSIST STAGE It HOSES, <br /> 11, <br /> 000 <br /> i I ;1 O <br /> fit I I I I I O 1 1 NOZZLES, BREAKAWAY VALVES AND ISD SENSORS PER NEW CARE EYUIRR PHASE 11 <br /> zo,000 GAL i REQUIREMENTS. INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT <br /> n DIESEL CONDUITS ENTERING THE DISPENSER SUMPS SHALL BE PVC COATED RIGID. START <br /> .- O N>\ L�__ _II - - -- _ — _ _ — _-I __- _- t _—_ — --_ AND VAPOR SHEAR VALVES AND MONITORING SENSORS. THE LAST 2 FEET OF ALL _ <br /> 1 __-�_� ilI <br /> UP BY MANUFACTURER REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES <br /> F t-O O 1 - I(i! ILII I III 0 ''f WITH A MINIMUM 2DO GALLONS THROUGH EACH HOSE/NOZZLE. ANY AIR <br /> 21),000 GAL I e EXISTING PRODUCT AND O -- } - POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR F. <br /> lil Itll Iil INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE <br /> OIESEL I VAPOR PIP;NG TO REMAIN <br /> O ( 3+c 3+11 3+01 CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR <br /> L <br /> t / L RECOVERY TESTING, CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED <br /> s O i GASOLINE FILTERS WITH NEW FILTERS. <br /> x i O <br /> 20.000 GAL <br /> DIS( O8 CONTRACTOR 70 EXTEND DOUBLE WALL PRODUCT AND SINGLE WALL VAPOR PIPING <br /> O �l EXISTND <br /> ING DIESEL TANK INTO MANUFACTURERS ALLRNEW PIPING SHALL BE APPROVED UL97ENT SUMPS AS SHOWN. CiH LISTZE ED. SLOPE <br /> IM AND DISPENSING SYSTEM <br /> TO REMAIN UNCHANGED PIPING 1/8" PER FOOT MINIMUM BACK TO POINT OF INTERCEPTION. +aA. 19 <br /> I <br /> UPGRADE EXISTING GASO <br /> PIPING TO REMAIN PATCH BACK EXISTING CONCRETE ISLANDS AND DRIVE SLAB TO MATCH EXISTING. _ <br /> EXISTING PROO DISPENSERS (TYP. S) BACKFILL AND PATCH PAVED AREAS AT PIPING TO MATCH EXISTING CONDITIONS. <br /> 6 S 4 t <br /> i <br /> EXISTING E.S.O. IN PLANTER <br /> C <br /> i NiO. oATn trNt77nt. <br /> PROPOSED SITE PLAN <br /> 1501 N.JACK TONE RD. <br /> 0 W. SANTOS AVENUE <br /> RIPON, CALIFORNIA 95366 <br /> Charles E.Thomas Company <br /> 13701 S.Alma Ave <br /> Gardens,Ca.90249 <br /> (310)323.6730 <br /> NEW INCON MONITORING <br /> A PANEL TO BE <br /> LO (c— LY I J A <br /> LOCATED <br /> ATW W I'M EXISTING TANK <br /> MONITORING EQUIPMENT <br /> EXISTING C-STORE <br /> 1 2 3 a am 5+5/08 rRAw to P.T.S.,INC. - TK9-1 <br />