<br /> VRM System Specification InstallatlOn 8�Steftug n9 y ® p y
<br /> y I� There are several different coir, schemes that may be encountered when connecting the AC Input Module and Relay
<br /> Refer to the Execut•ve Order 202,Exh,dit 2,for the most up to date system spectficatlols. TM required a lu pmenl to de - Module. These are dependent upon the use of optional features like Dispenser Hook Isolation,Line Leak Detection(LLD)
<br /> instaledfor the INCON VRM system is discussed below. Figure 1 shows the dWerent components and where they attach TS-550!5000/EMS Console Installation and Turbine Pump Interface that can affect the way these modules are wired. The descriotion below assumes that this
<br /> L
<br /> to the Console.Ail Mems in.bold are items directly related 10 the VRM apps cat:on is strictly a VRM system that is sensing the dispenser hook signals from gasoline products only and not controlling the
<br /> The console will be shipped with all modules L
<br /> installed and tested. Refer to the TS !nstallat%an Gutdc(p!n 000-2150) Submersible Turbine Pumps. For more information on the different wiring options see the TS-5xxx Installation Guide(pin
<br /> for mounting and wiring instructions. 000-2150)or contact Franklin Fueling Systems Technical Support at 1-800-964-6266.
<br /> Cwtro!ler I,t;xx;;le(CM) x.s
<br /> �' Po r5,pply MnMl PSAAj Dispenser Hook Signals
<br /> The dispenser hook signals are sampled by the AC Input Module
<br /> i so that the VRM can monitor the start and end of gasoline sales
<br /> I I I transactions. Follow the instructions below to lap into the Dispenser
<br /> Hook Signals with a parallel wire the AC Input Module. This methK Figure 1 will not lake control of the Submersible Pumps.
<br /> K
<br /> .r r� , Locale the gasoline product only dispenser hook signals at a_
<br /> point where they are still separated by dispenser. This may be a
<br /> dispenser hook isolation box or other method or they may just all be
<br /> ,' = t I ".I -�-•-- connected with a wire nut.
<br /> [] mill L
<br /> _ 2. Separate them by dispenser number then by fueling grade.
<br /> '""'^ Moa, a Is Moewee(blue! a° 3. Connect a wire in parallel from the line and neutral of each
<br /> - e.(re) dispenser hook signal to the AC Input Module.All existing wiring
<br /> �"°re ' -S-s0M(fronty-Will, rremwed) ". � ! =--y' should remain as is.
<br /> scM
<br /> i. s,,,,,,, I, i I -� ;� ,—., „•----yam 4. When wiring the Dispenser Hook signals to the AC Input Module,
<br /> ` seF. make dispenser 1 signals(al'gasoline grades)go to the first set
<br /> Dm°re I - _ s :-1 o^ o.._-..... of terminals. For example,If there are two hooks per dispenser
<br /> i ; TS-VFM lnstaltation ! .n ti) `w ,.,,.. (Regular arid Super)then wire.Dispenser 1 to positions I&2,then
<br /> Daeb•a•,I ! AC awn ; ar. r.ew ! uomA Field Installation $�: — -
<br /> r°,,.,w•py M•dW. y a F; Dispenser 2 to positions 3 8 4:
<br /> MtanY rnem.
<br /> all Mare Mww. MNm. M•yh Mean• To mount the Vapor Flow Meter(VFM)in the dispenser and make the
<br /> uco w,+r••°•!m.w•. I field wiring connections,follow the instructions in the TS-VFM Install
<br /> H ! ! Guide(p!n �...
<br /> 000-2144). P _I ire Dispenser Power Control
<br /> a°..Mt•n..•Ate.
<br /> In order for the console to shutdown a dis enser or all the d ispe nsers li
<br /> toSel a.nwn. �-.p.9 EOiine1 t ; l ;'_• I - I in response to an alarm condition,the dispenser power must be routed
<br /> Console Wiring Connection 2Z_
<br /> through the Relay Module. Run the Dispenser Power into the Common
<br /> um, See Probe Module diagram at right. The VFM is wirec to the Probe V
<br /> '^°^-o' ^•'% �t►icase=a,l -sol M ! ' Module inside the Console. Wire the Red wire to the+ter-rina!and the ; _ I and out of the Normally Closed contact of each required Relay Module
<br /> i .Black wire to the--lerminai. --ff! — _ g ! channel
<br /> use
<br /> i�--�'�i.�, ! '1—� The Relay Module is rated for 2Aof contnuous current. tithe
<br /> �I dispenser options created a need for more than 2A then the 1 O Relay
<br /> TS-VPS Installation ° Module will be needed. It is a good practice to wire the dispenser
<br /> O Field installation Ji _
<br /> i - ,.•. power in a logical order such as Dispenser 1 to Relay Channel 1,
<br /> To mount the Vapor Pressure Sensor(VPS)and mAke,he.,.e!d wring - C1
<br /> 6 ;? i Dispenser 2 to Relay Channel 2,etc.
<br /> g ; $ connections,follow the instructions in the,TS-VAS Install garde(pin i
<br /> E e 3 ff a 000-2143). There will be only one pressure sensor per ISD System.
<br /> Console Wiring _x-� •��:-+Nh
<br /> _ g See ciagram at right.The VPS is wired to the 4-20ma Mol
<br /> 2 the Console. Wire the sensor's Black wire to the+terminal and the
<br /> r• s sensor s White wire to the-terminal.
<br /> IF
<br /> 'mak-
<br /> 4 D
<br /> D
<br /> C
<br /> C
<br /> NO. DATE B.iTtst_
<br /> INCON SYSTEM WIRING
<br /> 1501 N. JACK TONE RD.
<br /> G W. SANTOS AVENUE
<br /> t B
<br /> RIPON, CALIFORNIA 95366 9
<br /> h
<br /> 3ho rAleS. me Thomas Company
<br /> iqq
<br /> Gardens,Co.90249
<br /> (310)323.6730
<br /> A FLT I J A
<br /> D•rz: 5/5108 •uw ay: P.T.S.,INC. yah TK3-2
<br /> i 2 3 4 ti d 7 a ® 10 n 12 13 - 14 16 to PTSD 2002 17 1a
<br />
|