My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:45:25 PM
Creation date
6/23/2020 6:57:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> FLYING J INC <br /> 333 West Center • North Salt Lake, Utah 84054 <br /> Phone (801) 296-7799 • Fax (801) 296-7800 <br /> NEDD <br /> Jul 2 2008 E ' <br /> Y <br /> JUL 0 7 2008 <br /> Muniappa Naidu ENVIPOO-M\;IE!v'i' HEALTH'' <br /> San Joaquin County F'ERta�JS RVICE9 <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, California 95202-3029 <br /> Dear Mr. Naidu, <br /> As per your request, I have listed a summary of the information I provided in our <br /> telephone conversation on July 1, 2008. <br /> 1. Flying J made the decision to replace the failed spill buckets at the Ripon facility <br /> with EMCO Wheaton 15 Gallon DW spill buckets. These spill buckets provide <br /> an additional protection to the environment due to the secondary containment <br /> below the spill bucket. Since these spill buckets are a special order item, there is <br /> a three week delivery time frame. We bid this project and these spill buckets <br /> were ordered the day the permit application was submitted to the County. <br /> 2. The diesel tanks are manifolded together. I instructed the site not to drop fuel into <br /> the failed spill buckets. <br /> 3. Although only two of the diesel spill buckets failed, Flying J made the decision to <br /> replace all of the diesel spill buckets. <br /> 4. Flying J paid an additional $1,800 to expedite the delivery of these spill buckets. <br /> 5. The spill buckets will be delivered on the 1St of July and the installation will be <br /> completed on the 2°d and 3'd of July. <br /> If you have any additional questions, please contact me. <br /> A <br /> ing <br /> Manager, Fuel and it Quality Systems <br /> Flying J Inc <br /> 801-296-7716 <br /> Cell: 801-725-4622 <br />
The URL can be used to link to this page
Your browser does not support the video tag.