My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:45:25 PM
Creation date
6/23/2020 6:57:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 15 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer F-1 Industry Standard ❑X Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum Hydrostatic <br /> El Other (Spec) <br /> Test Equipment Used: vplt Equipment Resolution: vplt to gph <br /> EEMEEMrU7DC# 9/10 UDC# 11/12 UDC# 13 UDC# 14 <br /> UDC Manufacturer: unknown unknown unknown unknown <br /> UDC Material: fiberglass fiberglass fiberglass fiberglass <br /> UDC Depth: 28" 28" 28" 28" <br /> Height from UDC Top to Top of loll 1011 1011 loll <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest lit lit lit lit <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Tested: 1 12 <br /> 11 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X�yes❑No❑N Yes❑No�N Yes❑No�N Yes QNo❑N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SEC 2-5 SEC 2-5 SEC 2-5 SEC <br /> Is system programmed for fail-safe ❑ ❑ o ❑ ❑ <br /> shutdown?* X Yes N N X Yes N NAEYes N N X Yes No <br /> Was fail-safe verified to be ❑ ❑ ❑ ❑ ❑ <br /> operational?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5MIN 5MIN 5MIN 5MIN <br /> test: <br /> Test Start Time: 12:22 12:00 15:26 15:50 <br /> Initial Reading(Rl): 6.154 5.073 3 .757 6.17 4 <br /> Test End Time: 12:37 12 :15 15:41 16:05 <br /> Final Reading(RF): 6.154 5.073 3.754 5.889 <br /> Test Duration: 15min 15min 15min 15min <br /> Change inReading(RF-Ri ): OOOGPH OOOGPH OOOGPH .03GPH <br /> Pass/Fail Threshold or Criteria: .05GPH .05GPH .05GPH .05GPH <br /> ,MEN= <br /> Was sensor removed for testing? X Yes N NA X Yes No❑ XNA Yes N NA X Yes❑No <br /> Was sensor properly replaced and � � � CEI � ❑ � ` <br /> verified functional after testing? Ye N NA Ye NNA Ye N NA X yes NQJ <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> DISP. 19 on the backside was not tested due to a tear in the oot. <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.