My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:45:25 PM
Creation date
6/23/2020 6:57:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SWRCB,January 2002 Page 2 3 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: F-1 UDC Manufacturer F-1 Industry Standard X❑ Professional Engineer <br /> 0 Other (Specify) <br /> Test Method Used: FI Pressure ❑ Vacuum Hydrostatic <br /> 0 Other (Spec) <br /> Test Equipment Used: vplt Equipment Resolution: vPlt to gph <br /> UDC# 29sat UDC# 30 UDC# 30sat UDC# <br /> UDC Manufacturer: unknown unknown unknown <br /> UDC Material: fiberglass fiberglass fiberglass <br /> UDC Depth: 28" 28" 28" <br /> Height from UDC Top to Top of 1011 loll 1011 <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest lit lit lit <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good <br /> Portion of UDC Tested: I 1211 1211 1211 <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothX❑yes�No❑N Yes❑No�N Yes❑N ]N []Yes RNoa <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SE C 2-5 S EC 2-5 SEC <br /> Is system programmed for fail-safe ❑ ❑ � ❑ � ❑ F--'Yes <br /> ❑ <br /> shutdown?* X Yes N N X Yes N N % Yes N N X Yes No <br /> Was fail-safe verified to be ❑X ---'Yes❑N N Yes❑N N [-]Yes❑NoaYes❑N�N X <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5MIN 5MIN 5MIN <br /> test: <br /> Test Start Time: 9:58 11:14 10:00 <br /> Initial Reading(RI): 4.679 6.336 3.151 <br /> Test End Time: 10:13 11:29 10:15 <br /> Final Reading(RF): 4.536 6.336 3.334 <br /> Test Duration: 15min 15min 15min <br /> Change in Reading(RF-RI ): .O1GPH OOOGPH .02GPH <br /> Pass/Fail Threshold or Criteria: .05GPH .05GPH .05GPH <br /> Was sensor removed for testing? X Yes No❑NA X Yes N NA F77-X Yes No❑NA Yes❑No <br /> Was sensor properly replaced ands[7]� ❑ � � ❑ ❑ <br /> verified functional after testing? X Ye N NA X Ye N NA X Ye N NA Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> DISP. 19 on the backside was not tested due to a tear in the boot. <br /> I If the entire depth of the UDC is not tested,specify how much was tested.If the answer to-any-of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.