Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Pae I of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) ® 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- DIESEL TANKS #2 & #3 <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only)1-1 1 <br />1 <br />BUSINESS NAME (Same as FACILITY NAME) Flying J Travel Plaza - #618 <br />3. <br />BUSINESS SITE ADDRESS 1501 N. Jack Tone Rd 103. CITY Ripon <br />104. <br />II. EQUIPMENT 'TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR 2632, 2634 2638 2641 <br />MONITORING EQUIPMENT IS SERVICED® I. ANNUALLY ❑ 99. OTHER (Specify): <br />490-3b <br />III. MONITORING LOCATIONS <br />®1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490-4 <br />IV. TANK MONITORING IS PERFORMED USING THE F'OLLOWING'METHOD(S): <br />® 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490.6 <br />PANEL MANUFACTURER: Veeder Root a9az-4-MODEL #: TLS -350 --�-- <br />0-90-8 <br />" <br />LEAK SENSOR MANUFACTURER: Veeder Root 490.9. : MODEL #(S): 794380-303 <br />490:10 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 410-12• MODEL #: <br />490-13 <br />____-_---------------- <br />IN -TANK PROBE MANUFACTURER: 410.14. MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />- - - - - - - - - - - - - -- - - - - --- - - - - - - - - - --------------- - - - - - - - - - -- - - -- - --------------- --------------------------------------- <br />PROGRAMMED TESTS: a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHERS eci <br />❑ g•P• g•P• (Specify): <br />490-18 <br />410-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: Ela. 36 HOURS F1b. 60 HOURS <br />490-21 <br />490-22 <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />TEST FREQUENCY: ❑ a. ANNUALLY E]b. BIENNIALLY ❑ c. OTHER (Specify): <br />490-25 <br />® 99. OTHER (Specify): VISUAL DONE DAILY <br />490-26 <br />49az7 <br />V. PIPEMONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490.28 <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />PANEL MANUFACTURER: Veeder Root 490-30 <br />MODEL #: TLS -350 <br />490-31 <br />•-•--••-•-•---•---------------------•----- - - - - - - -- ---------------------------------- - <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-32 <br />- - -- - -- - - - - - - - - - <br />MODEL #(S): 794380-208 - - <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO <br />490-34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-35 <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 <br />490-36 <br />_ -_ <br />MLLD MANUFACTURER(S): VAPORLESS 490-37 MODEL #(S): LD2000 <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />-- <br />490-39 <br />ELLD MANUFACTURER(S) W_40- MODEL #(S): -- - -- <br />49041 <br />_._. -1----- --- ---_______--_._-__---_____-_ <br />_ PROGRAMMED IN LINE LEAK TEST: - ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. _ ❑ 2. MINIMUM ANNUAL 0.1g•P• h. <br />_ <br />490-42, <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49°-43 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490.44 <br />❑ 4. PIPE INTEGRITY TESTING 490-45 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER(Specify) 490-46 490-47 <br />❑ 5. VISUAL PIPE MONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED- <br />490.49 <br />* Allowed for =nitorin of unburied emergency generator fuel piping only HSC 25281.5 3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA [23 CCR §2636(a)(3)1. <br />490-50 <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490.51 <br />❑ 99.OTHER(Specify) <br />490-52 <br />490.53 <br />UPCF UST -D (12/2007) 4/23 <br />