Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE ❑ I. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) ® 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- OTT,/WATER SEPARATOR TANK <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) _ <br />t <br />BUSINESS NAME (Same as FACILITY NAME) Flying J Travel Plaza - #618 <br />3. <br />BUSINESS SITE ADDRESS 1501 N. Jack Tone Rd 103' CITY Ripon <br />104. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR 2632, 2634, 2638, 2641 <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): <br />a9a-3b <br />III. MONITORING LOCATIONS <br />® 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490-4 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />® 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490-6 <br />PANEL MANUFACTURER: Veeder Root 4942 t MODEL #: TLS -350 <br />490-8 <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9 MODEL #(S): 794380-303 -___________490=io <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-12• MODEL #: <br />490-13 <br />IN -TANK PROBE MANUFACTURER: 491-14. MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY El e. OTHER (Specify): <br />490-17 <br />• ...490-18 <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490.20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: Ela. 36 HOURS F-1 b. 60 HOURS <br />90-21 <br />490-22 <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />TEST FREQUENCY: (p �')� <br />: ❑ a. ANNUALLY [:1b. BIENNIALLY F-1 c. OTHER (Specify): <br />490-z <br />494255 <br />❑ 99. OTHER (Specify): VISUAL DONE DAILY <br />490-26 <br />490-27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />® 1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />PANEL MANUFACTURER: Veeder Root 490-30 <br />MODEL #: TLS -350 - <br />490-31 <br />------------------------------•--------- - - - - - - - - -------------------------------- 49432 - -- - <br />LEAK SENSOR MANUFACTURER: Veeder Root <br />- - - - -- -- - - - - --- - <br />MODEL #(S): 79_4380-208 <br />490-33_ <br />_ _ - -�_ <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a. YES ® b. NO <br />490-34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ® b. NO <br />490-35 <br />El 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 <br />490.36 <br />MLLD MANUFACTURER(S): 49°-37 MODEL #(S): --- -- -�-- <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />_ ELLD MANUFACTURER(S) 490-40• ' MODEL #(S): _-__--____490.41__ <br />-49042 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h.� <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49043 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-44 <br />4. PIPE INTEGRITY TESTING 49045 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHERS i 49046490.47 <br />❑ 5. VISUAL PIPE MONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED" <br />49049 <br />` Allowed for mnitoring of unburied emEjency generator fuel piping only per HSC §25281.5(b)(3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA [23 CCR §2636(a)(3)]. <br />490-50 <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />❑ 99. OTHER (Specify) <br />49452 <br />490-53 <br />UPCF UST -D (12/2007) 10/23 <br />