Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />RESPONSE PLAN — PAGE 1 (One form per facility) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION Rol. <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same as FACILITY NAME) Roz. <br />Flying J Travel Plaza - #618 <br />BUSINESS SITE ADDRESS R03. <br />CITY R04. <br />1501 N. Jack Tone Rd <br />Ripon <br />II. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facilitys Hazardous Materials <br />Business Plan. <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too <br />saturated to be effective. It will then be managed properly. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. <br />➢ Facility personnel will determine whether or not any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br />contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. <br />will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III.SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />Absorbent granules/pads R10. <br />R20. <br />R30. <br />RI I. <br />R21. <br />R31. <br />R12. <br />R22. <br />R32. <br />R13. <br />R23. <br />R33. <br />R14. <br />R24. <br />R34. <br />R15, <br />R25. <br />R35. <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME Roo. <br />TITLE R50. <br />Edna Huck <br />General Manager <br />NAME Rot. <br />TITLE Rsl. <br />Joey Cupp <br />Environment Management <br />NAME Raz. <br />TITLE R52• <br />NAME Rai. <br />TITLE R53• <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />❑Additional system testing or data collection ®Inspection by qualified persons ❑Recalibration of equipment <br />Other: Tester or Designated Operator R60. <br />UPCF UST -A 1/1 <br />