Laserfiche WebLink
SWRCB, January 2002 <br />Page 1 of 7 <br />Secondary Containment Testing Report Form <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />I _ FArII.ITV INFORMATION <br />Facility Name: Pilot/Flying J #618 Date of Testing: 7/27/2011 <br />Facility Address: 1501 N. Jack Tone Road Ripon CA, <br />Facility Contact: Manager Phone: 209-599-414 <br />Date Local Agency Was Notified of Testing: 7/8/2011 <br />Name of Local Agency Inspector (if present during testing): None I IL 0111110 1%0 01111111 19 W <br />2 TFCTTNf_' CONTRACTOR INFORMATION of Ir, a A 11199 <br />Company Name: Jones Covey Group,Inc. <br />Pass <br />Technician Conducting Test: Edwin Coreas <br />SAN JOAQUIN COUNTY <br />Credentials: ❑ CSLB Licensed Contractor <br />IRONMENTAr- <br />® SWRCB Licensed Tank Tester <br />License Type: <br />Not <br />Tested <br />License Number:03-1652 <br />Manufacturer <br />Manufacturer Training <br />Component(s) Date Training Expires <br />Incon TS -STS <br />7/12/2013 <br />❑ <br />Tank #4 Unl. 87 vapor bucket <br />® <br />❑ <br />❑ <br />❑ <br />'A_ SiTMMARV OF TF,ST RF.SLTI,TS <br />Component <br />Pass <br />Fail Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Tank #1 Diesel STP sump <br />® <br />❑ <br />❑ <br />Tank #4 Unl. 87 vapor bucket <br />® <br />❑ <br />❑ <br />❑ <br />Tank #2 Diesel STP sump <br />® <br />❑ <br />❑ <br />Tank #5 Plus 91 vapor bucket <br />® <br />❑ <br />❑ <br />❑ <br />Tank #3 Diesel STP sump <br />® <br />❑ <br />❑ <br />❑ <br />Tank #1 DSL secondary piping <br />❑ <br />PUF <br />❑ <br />❑ <br />Tank #4 Unleaded 87 STP sump <br />E:❑ <br />Tank #2 DSL secondary piping <br />❑ <br />❑ <br />Tank #5 Premium 91 STP sump <br />❑ <br />Tank #3 DSL secondary piping <br />❑ <br />❑ <br />El <br />Tank #6 Auto Diesel STP sump <br />F-1❑ <br />Siphon #1 secondary piping <br />El❑ <br />L1Tank <br />#1 Diesel fill bucket <br />IZN <br />E] <br />F-]E] <br />Siphon #2 secondary piping <br />❑ <br />® <br />❑ <br />Tank #2 Diesel fill bucket <br />❑ <br />❑ <br />F -]Siphon <br />#3 secondary piping <br />F-1ElTank <br />#3 Diesel fill bucket <br />❑ <br />❑ <br />❑ <br />Siphon #4 secondary pipingTank <br />#4 Unleaded 87 fill bucket <br />❑ <br />❑ <br />Tank #3 87 secondary piping <br />® <br />❑ <br />❑ <br />❑ <br />Tank #5 Plus 91 fill bucket <br />® <br />❑ <br />❑ <br />I <br />Tank #4 91 secondary piping <br />® 1 <br />❑ 1 <br />❑ <br />❑ <br />Tank #6 Auto Diesel fill bucket <br />❑ <br />❑ <br />Tank #5 ADSL secondarypiping <br />® I <br />❑ 1 <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Water - Recycle and Reuse <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature:A� Date 7/27/2011 <br />�7 <br />