Laserfiche WebLink
0 0 Page 2 of 3 <br /> Sent: Monday, August 04, 2014 4:05 PM <br /> To: Elena K. Manzo [EH] <br /> Subject: RE: PFJ #618 Ripon <br /> Hello Elena, <br /> Yes 1 believe that is the only permit we have open. There is a bunch of testing so it will <br /> be a 2 day test and we will need to pull the boots back so possibly going into 3 days. <br /> Can we start on the 19th we will still be on site for sure the next 2 days? We also have a <br /> 6-month retest for (The three existing diesel lines will need to have a six month secondary <br /> containment test completed since new secondary components were installed. The test is due by <br /> 9/20/14 for all three lines). I was hoping we could get all this done at once. <br /> Holly D. Mendez <br /> Environmental Compliance <br /> Jones Covey Group, Inc. <br /> (888) 972-7581 xt. 205 <br /> (909) 229-2932 Cell <br /> (909) 484-0300 Fax <br /> website:wwwjoneuevev.com <br /> From: Elena K. Manzo [EH] [_mailto:emanzo@sicehd.com] <br /> Sent: Monday,August 04, 2014 4:00 PM <br /> To: Holly Mendez <br /> Subject: RE: PFJ#618 Ripon <br /> Hi Holly, <br /> Thank you for your email. Is this in any way related to your permit for penetration replacement at this <br /> facility? If it's permit related, I have to observe the testing and I am out of the office from 8/14 through <br /> 8/19. Thank you <br /> Sincerely, <br /> Elena K. Manzo, REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 E. Hazelton Ave. <br /> Stockton, CA 95205-6232 <br /> Voice: (209) 953-7699 <br /> 8/6/2014 <br /> I <br />