Laserfiche WebLink
JUN 2 92015 <br /> 3. Failed to record or report unauthorized release in appropriate time frame. <br /> On May 14, 2015, oily staining was noted on the floor(around the suction pump) and pooling <br /> of oily liquid was noted on the suction pump housing and inside the Bioshed sump. Any <br /> release from the primary containment that does not escape the secondary containment and <br /> was cleaned up within eight hours of being detected shall be recorded with the following <br /> information. <br /> 1. Operator's name and phone number <br /> 2. List of types, quantities, and concentrations of hazardous substances released <br /> 3. Description of actions taken to control and clean the release <br /> 4. Method and location of disposal of the released substances <br /> 5. Description of actions taken to repair and prevent future releases <br /> 6. Description of method used to reactivate interstitial monitoring after repair or <br /> replacement of primary containment <br /> Immediately record this release with the information required, and maintain it onsite with the <br /> facility's monitoring records. Submit a copy of the recordable release statement to the EHD. <br /> This is a Class II violation. <br /> As noted in the UST Inspection Report, oily liquid was discovered in the Bioshed during the <br /> inspection. Jones Covey technicians were able to investigate and determined that the liquid <br /> was not biodiesel or diesel. Technicians cleaned the liquid and staining prior to leaving the <br /> site, and a follow up inspection on June 3, 2015, did not reveal any visible liquid or staining in <br /> this area (Work order enclosed for your review). Since this liquid was determined to be <br /> neither biodiesel nor diesel, it is the position of PFJ that a recordable release form is not <br /> applicable in this instance. PFJ personnel will continue to monitor all secondary containment <br /> to ensure that it is clean and dry. <br /> 4. Designated operator did not inspect all required items and/or the inspection reports not <br /> completed. <br /> 1) The designated operator failed to check and note the correct test dates for the secondary <br /> containment testing on the August 26, 2014 and November 20, 2014 designated operator <br /> monthly inspection reports. During the monthly inspection, the designated operator shall <br /> check that all required and maintenance for the UST system have been completed and <br /> document the dates they were done. Ensure that designated operators performing monthly <br /> inspections at this facility are including all of the required information on the reports. <br /> 2) The designated operator failed to verify that all employees have been trained during the <br /> January 2015 monthly inspection. During the monthly inspection, the designated operator <br /> shall verify that all facility employees have been trained. Ensure that designated operators <br /> performing monthly inspections at this facility are including all of the required information on <br /> the reports. <br /> This is a Class II violation. <br /> The referenced monthly inspection reports have been amended and are enclosed for your <br /> review. PFJ has reviewed the importance of correctly completing all paperwork with the <br /> designated operators, and will continue to review the designated operator monthly reports for <br /> completion following each inspection. <br />