My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2 of 3 <br /> 6. PIPING SUMP TE f-a tiq ,,, �1.mr <br /> Test Method Developed By: ❑Sump Manufacturer 9Industry Stared P f, fessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: IN CON TS-STS Equipment Resolution: +/-0.002" <br /> Sump# T5-91 STP Sump# Sump# Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 82" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 15" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 49„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 55" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?` <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe ❑yes []No ifl NA []Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No k NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15min <br /> test: <br /> Test Start Time: 12:22pm <br /> Initial Reading(RI): 4.3122" <br /> Test End Time: 12:37pm <br /> Final Reading(RF): 4.3119" <br /> Test Duration: 15min <br /> Change in Reading(RF-RI): 0.0003" <br /> Pass/Fail Threshold or Criteria: +/-0.002" <br /> Test Result: In Pass ❑Fail ❑ Pass ❑Fail ❑ Pass []Fail ❑ Pass []Fail <br /> Was sensor removed for testing? X Yes []No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> Was sensor properly replaced and <br /> ® <br /> verified functional after testin ? Yes ❑No [INA El Yes 11 No E-1NA [1 Yes 11 No 9 N F-1 Yes 11 No 9 N <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> T5-91 STP Sump had failed previously.After Further repairs made were STP Sump collar was fiberglass reinforced, & <br /> product line penetration was replaced. T5 STP Sump is now passing hydrostatic testing. <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to anV of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.