My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE <br /> D. Results of Testing/Servicing � 4i' � 2 Zvi I <br /> Software Version Installed: 317.02 <br /> Ems(".�LT <br /> Coat late the followi checklist; <br /> x Yes No' Is the audible alarm operational? <br /> u Yes No* Is the visual alarm operational? <br /> x Yes No` Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> x Yes No` Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will nal interfere with their <br /> ro er operation? <br /> w Yes No" If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> e piping secondary containment monitoring system <br /> x Yes No* For pressurized piping systems, does the turbine automatically shut down if th <br /> N/A detects a leak,fails to operate,or is electrically disconnected? if yes:which sensors initiate positive shutdown? (Check all that apply) <br /> BSump/Trench Sensors; ODispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? ElYes; E]No. <br /> Yes No` For tank systems that utilize the monitoring system as the primary tank overfill warning device(ti no mechanical overfill prevention <br /> x N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> Of tank C aci does the alarm tri er? % <br /> x Yes' No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> Yes" K No Was liquid found inside any secondary containment systems designed as dry systems? (Check alt Phat apply)[]Product; pWater. if <br /> es,describe causes In Section E,glow. <br /> x Yes No, Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> x, Yes No* Is all monitoring equipment operational per manufacturer s specifications? <br /> *In Sect"son E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> UQC 14/15 sensor was defective. Had to re lace with a neve 794380-208 Sensor. Tested as <br /> needed after and checked out okay. <br /> Monitoring System Certification <br /> Page of 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.