My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR A 6 2016 <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by H� <br />1 • Site map enclosed? YES [ ] NO [ ] C,vt: t.� •.�� <br />kit <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Saw out concrete perimeter of direct bury fills on Tanks 2 and 3. <br />Break out concrete and haul off for proper disposal. <br />Remove (2) existing Fill/Spill buckets from tanks 2 and 3 <br />Replace Existing (2) Emco Wheaton with OPW model# 1 SC -31532D on Tanks 2 and 3 <br />Replace existing Drop tubes on tanks 2 and 3 with OPW drop tubes model# 71 SO -420C <br />C1® � <br />Schedule Pre -bury inspection <br />Recieve approval for backfill and patch "'AH 13 2017 <br />ENVIRONMENTAL <br />.ENT <br />As -Built 3/6/17 <br />Replacement of existing 3" x 15" flex connector was determined unnecessary. Replaced one (1) 3" black iron union and one (1) 3" <br />black iron tee fitting on T-2 and T-3 diesel in lines. Tightened 3" flange at diesel out line. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />*Diesel Tanks #2 and #3 have 15 gallon Emco Wheaton to be replaced with OPW model# 1 S_C_-_3.1532D <br />Diesel Tanks #2 and #3 drop tubes to be replaced with OPW model# 71 SO -420C <br />(1) Black iron 3" union, (1) black iron 3" tee AS -Built 3/6/17 <br />Install (1) Icon Split Penetration repair fitting model# IC-RFRIDIG3.5F in UDC 14-15 <br />Install (1) Icon Split Reducer boot model# ISR3.5X2,4 in UDC 14-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.