Laserfiche WebLink
• <br />RECEIVED <br />UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br />UST Monitoring Site Pian JAN 0 4 2017 <br />Site Address: Pilot Flying J -1501 N. Jack Tone Rd., Ripon CA <br />PHASE 6 -1/19/17 THROUGH <br />1/21/17 If <br />PHASE 5 - 1/18/17 THROUGH <br />1/21/17 <br />PHASE 4 - 1/17/17 THROUGH <br />1/21/17 <br />PHASE 3 - 1/11/17 THROUGH <br />1/13/17 <br />PHASE 2 - 1/10/17 THROUGH <br />1/13/17 <br />PHASE 1 -COMPLETED <br />Date map was drawn: <br />ENVIRONMENTAL <br />HEALTH OM, RTMENT <br />D• DrtPe <br />P- vmawft carts Pana <br />S. Su <br />STP= TUN" SWp <br />F -FM Butlrc1 <br />V. <br />VWn, B." <br />A- Amulet swear <br />M. AUlwkakG Ta k Daps <br />TS. Tmlaalwi Supp <br />L= Line Laak DoWtV <br />Proand Lna <br />Vwi Lara= ...._..,....... <br />Vapor Ln— <br />Cat= Man N Saperaw <br />VT= Vent Lna <br />Eiawph STPS(- Tudd Jwar/Lir <br />Lwla Dawpr � <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locationsof the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps,dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in4ank liquid level probes (if used for leak detection). In the space provided, note the date this Site <br />Plan was prepared. <br />Page 5 of_ <br />