My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />SWRCB, January 2002 DEC 8 2016 e Of 7 <br />7. UNDER DISPENSER CONTAINMENT (UDC1 TESTING <br />Test Method Developed By: D UDC Manufacturer IN Industry Stand (N 9 r i neer <br />❑ Other (SpeCif—Y) � �'� <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Sped) <br />TestEquipmentUsed: iNCON-TS-STS l+"nmrnnPn+RPQnII�nn• tf_Anno <br />Comments -- (include information on iepedrs made prior to testing, and recommendedfoldow-up forfailed tests) <br />1 I£ the entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or'WA", the entire UDC must be testes. (See SWRCB LO -160) <br />10 <br />UDC # 11-12 <br />UDC # 13 <br />UDC # 14-15 <br />UDC Manufacturer. <br />7Fiberqlass <br />Unknown <br />Unknown <br />Unknown <br />UDC Material: <br />Fibe lass <br />Fiber lass <br />Fiber lass <br />UDC De the <br />30" <br />30" <br />30" <br />Height from UDC Bottom to Top <br />13" <br />2" <br />1 <br />1311 <br />Of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />81t <br />81' <br />9" <br />9., <br />Condition of UDC prior to <br />testing: <br />Dr' <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested <br />27" <br />25" <br />27" <br />26" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes ENO Im NA <br />❑ Yes D No <br />IN NA <br />D Yes D No <br />® NA <br />D Yes D No [K NA <br />product and water)?' <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?' <br />1111Yes DNo 01 NA <br />❑ Yes ❑ No <br />Ig NA <br />Yes D No <br />® NA <br />17 Yes D No 11 NA <br />Was fail-safe verified to be <br />a rational?° <br />Q Yes D No ONA <br />❑ Yes ❑ No <br />® NA <br />❑ Yes ❑No <br />IN NA <br />❑ Yes ❑ No IN NA <br />Wait time between applying <br />pressure/vacuumhvater and <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />startin& test <br />Test Start Time: <br />10:08am <br />9:49am <br />�2. <br />11:53am <br />11:53am <br />Initial Reading1.8137 <br />7974 <br />5.9975 <br />6.1582 <br />Test End Time: <br />10:24am <br />10:04am <br />12:08am <br />12:08pm <br />Final Reading F = <br />1.8138 <br />2.7987 <br />5.9964 <br />6.1583 <br />Test Duration: <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Chane in Re - <br />+0.0001 <br />+0.0013 <br />-0.0011 <br />-+0.0001 <br />Pass/Fail Threshold or Criteria: <br />+/-0,002" <br />+/-0.002" <br />+/-0.002" <br />+/-0.002" <br />Test.Resalt:..':'' ' :' ::::.:...; :::' .'.'..: <br />:: ; ® Pass ❑ Fail <br />®Pass ❑Felt <br />Pass .' ❑Fall <br />:Pass ❑Fail <br />Was sensor removed for testing? <br />IN Yes ENO [INA <br />® Yes ❑No <br />D NA <br />W Yes DNo <br />DNA <br />® Yes ❑No ❑ NA <br />Was sensor properlytest and <br />verified functional afterer testin ? <br />M Yes [No DNA <br />® Yes D No <br />❑ NA <br />[N Yes D No <br />DNA <br />(MYes ❑ No DNA <br />Comments -- (include information on iepedrs made prior to testing, and recommendedfoldow-up forfailed tests) <br />1 I£ the entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or'WA", the entire UDC must be testes. (See SWRCB LO -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.