Laserfiche WebLink
s <br />• <br />UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br />UST Monitoring Site Plan <br />Site Address: Pilot Flying J - 1501 N. Jack Tone Rd., Ripon CA <br />PHASE 6 -1/19/17 THROUGH <br />1/21/17 Ij <br />PHASE 5 - 1/18/17 THROUGH <br />1/21/17 <br />PHASE 4 - 1/17/17 THROUGH <br />1/21/17 <br />PHASE 3 - 1/11/17 THROUGH <br />1/13/17 <br />PHASE 2 - 1/10/17 THROUGH <br />1/13/17 <br />PHASE 1 -COMPLETED <br />Sro•Pamr <br />$ S,yTpmp <br />v <br />1L <br />' <br />Date map was drawn: <br />9 <br />LE" <br />D- Dspmsa <br />P= MWtorov CW" Panes <br />S= Sensor <br />ST P= Tonka Sump <br />F=FA OUCwt <br />V. <br />Vapor MM <br />M- Aonula Saner <br />M. A ..k Tan Gaps <br />TS= TrdnKAen Sump <br />L= Lim Leak Detach <br />Rodad Lams= <br />VeM tees= ................. <br />Vapor Lhm - ,�.. <br />CAS= Clean Aa SQWAM <br />VT= vent U. <br />FiaaM STPM -TwbbW Sema/LNe <br />Leak OWW ., <br />X0 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locationsof the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps,dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site <br />Plan was prepared. <br />Page 5 of <br />