Laserfiche WebLink
SWRCB,January 2002 Page o7 2016 <br /> 7. UNDER-DISPENSER CONTAINMENT UDQ TESTING 4100,y W <br /> Test Method Developed By: ❑UDC Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON STS Equipment Resolution: <br /> UDC# 11-12 UDC# 13 UDC# 14-15 UDC# 16 <br /> UDC Manufacturer: Unknown Unknown Unknown Unknown <br /> UDC Material: Fiber lass Fiberglass Fiber lass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 12" 12" 12" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 8" 8" 8" 8" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested' 25" 24" 25" 26" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes -]No 9 NA ❑Yes ❑No X NA -]Yes ❑No X NA ❑Yes ❑No X NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- -1 Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA <br /> safe shutdown?" <br /> Was fail-safe verified to be <br /> ❑ <br /> operational?* Yes 7 No XNA 71 Yes No X NA -1 Yes ❑No Al NA F1 Yes -INo A NA <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 11:07am 8:53am N/A 9:20am <br /> Initial Reading (RI): 3.3939 5.9684 N/A 4.5594 <br /> Test End Time: 11:22am 9:09am N/A 9:36am <br /> Final Reading(RF): 3.3945 5.9689 N/A 4.5596 <br /> Test Duration: 15 minutes 15 minutes N/A 15 minutes <br /> Change in Reading RF-Ri : 0.0006 0.0005 N/A 0.0002 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 N/A 0.002 <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ❑ Pass 9 Fail ® Pass i ❑Fail <br /> Was sensor removed for testing? -1 Yes ❑No 9 NA -1 Yes 7 No X NA -1 Yes -1 No 'X NA 71 Yes F1 No X NA <br /> Was sensor properly replaced and -1 Yes ❑No Xl NA -1 Yes __1 No X NA :1 Yes 71 No 9 NA ❑Yes El No X NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UDC 14-15 Failed due to Vapor Penetration &3.5X2.5 Boot. <br /> Per Inspector Elena Manzo(1) 15 minute test with the INCON unit was suffice. <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />