Laserfiche WebLink
SWRCB,January 2002 Page 6 of 12 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: i:_I Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: IX.Pressure Vacuum CI Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> Piping Run# T#1 DR Piping Run# T#4 87 Piping Run# T#5 91 Piping Run# T#6 D <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 4" 3" 3" 3" <br /> Length of Piping Run: 275' 300' 300' 325' <br /> Product Stored: Diesel Unleaded 87 Premium 91 Diesel <br /> Method and location of STP 1 to RV UDC's STP to Auto UDC's STP to Auto UDC's STP to Auto UDC's <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 08:15am 08:30am 08:45am 08:45am <br /> Initial Reading(RI): 15.0 psi 5.0 psi 5.0 psi 5.0 psi <br /> Test End Time: 09:30am 09:30am 09:45am 09:45am <br /> Final Reading(RF): 5.0 psi 5.0 psi 5.0 psi 5.0 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0.0 psi 0.0 psi 0.0 psi 0.0 psi <br /> Pass/Fail Threshold or 0.0 psi 0.0 psi 0.0 psi 0.0 psi <br /> Criteria: <br /> Test Result: 9 Pass 0 Fail ®Pass 0 Fail ® Pass 0 Fail ® Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> **KEY"* <br /> T#1 DRV(Diesel T#1 Diesel RV secondary)T#4 87(87 Tank#4 secondary)T#5 91 (91 Tank#5 secondary)T#6 D <br /> (Diesel ank#6 secondary) <br /> n � 7016 <br />