Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 133.05 <br /> Complete the following checklist: <br /> k Yes ❑ No' Is the audible alarm operational? <br /> .0 Yes ❑ No' Is the visual alarm operational? <br /> 41 Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 91 Yes ❑ No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> xi Yes ❑ No` If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> ❑ N/A <br /> *1 Yes ❑ No" For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ N/A detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> EMSump/Trench Sensors; ()Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? ®Yes; ONo. <br /> n Yes n No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> x❑ N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank caeacity does the alarm trigger? % <br /> C Yes` ❑ No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes` u❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)®Product; []Water. If <br /> es,describe causes in Section E,below. <br /> C Yes ❑ No" Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> *3 Yes ❑ No" is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Vent box Rna brine censor was not working Replace sensor (like for like). Retested Dass. <br /> Monitoring System Certification Page of 12/07 <br />