Laserfiche WebLink
6/11/2015 Pilot Flying J#)518 Ripon Site Map <br /> loct <br /> Y <br /> UNDERGROUND STORAGE TANK MONITORING SYSTEM C ERTIFICATI <br /> UST Monitoring Site Plan Z01`�®LZCN`LN <br /> `® <br /> Site Address;Pilot Flying J—1501 N.Jack Tone Rd., Ripon CA <br /> rimae <br /> D-Dispenser <br /> P=Monitoring Coned Panel <br /> Sm Sensor <br /> STP--Turbine Sump <br /> F=Fit Bucket <br /> V=Vapor Bucket <br /> A=Annular Sensor <br /> N1=A lornatic TanK Cage <br /> ° TS=Transition Sump <br /> L=Line Leak Detector <br /> �- Product Lktes= <br /> Vent Unes= ............... <br /> Vapor Llnes= <br /> ti0 1y GAS=Green Air Seperaiur <br /> VT=Vent Lines <br /> n� Example STP/S4=Turbk,®✓Sensor/Lke <br /> Leak Do tor <br /> S <br /> ry� ti5L <br /> V <br /> l °f <br /> Sn Y p5 0S v` <br /> L1 v <br /> 7?` <br /> 14 <br /> �A <br /> 23 �- <br /> 1 <br /> 15 V10 V° IN <br /> r <br /> �� M r .......:........._...... <br /> L'a 20 Stub. i l <br /> ....... <br /> y a <br /> 2s� .30 <br /> '1 D <br /> .9 J <br /> v <br /> l Y <br /> 1 L� <br /> L71 <br /> L21 <br /> lS <br /> p :J Ll/ 3x10 11/12 LW <br /> ase � L75 � 79 L18 <br /> y LTi V2 3x4 114 <br /> L26 <br /> S <br /> 0 <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your <br /> Monitoring System Certification.On your site plan,show the general layout of tanks and piping.Clearly identify <br /> locationsof the following equipment,if installed: monitoring system control panels;sensors monitoring tank annular <br /> spaces,sumps,dispenser pans,spill containers,or other secondary containment areas; mechanical or electronic line <br /> leak detectors;and in-tank liquid level probes(if used for leak detection).In the space provided, note the date this Site <br /> Plan was prepared. <br /> hhpsJ/www.gliffy.corn/go4ftl5rM7848?toke=&app=1Li5094b0-6042 11 e2-bcfd- =false 1/3 <br />