Laserfiche WebLink
6/11/2015 9 Pilot Flying J#618 Ripon Site Map 0 RECEIVED <br /> UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATIO 1 <br /> UST Monitoring Site Plan LNC'I RON hI ENTAL HEALTH <br /> DEPAIZTNIENT <br /> Site Address: Pilot Flying J—1501 N.Jack Tone Rd.,Ripon CA <br /> r&WM <br /> D=Dir <br /> P=Fbnibrirg Cord ParL4 <br /> S=Sensor <br /> STP-Turbine Sump <br /> F=RI Bucket <br /> V=vapor Bucket <br /> A=Annular Settlor <br /> W Automatic Tank liege <br /> 3 <br /> TS=Transition Sump <br /> L=L6re Leak Detector <br /> �• Product Littes- <br /> Vert Lar ............... <br /> ,? Vapw Lire= <br /> 1� CAS=dean Ar Seperakx <br /> .p• VT--Vert Llrtes <br /> Example STP/52=Tlrrbine/Senscr/Lim <br /> 0 �4 Leak Detctor �.. <br /> S <br /> V e V <br /> •�c <br /> 14 <br /> liq S l� <br /> �A <br /> 23 � <br /> S v\o l=/J� �N <br /> Q0 l .( <br /> %A ( g <br /> ( g ....... <br /> 1 5 43 r <br /> ZfrJ �q a <br /> r <br /> V. <br /> ti x r <br /> r- <br /> i <br /> 1 L19 <br /> t a21 <br /> 74 1 <br /> Is <br /> r <br /> v L11 &10 11/12 L% <br /> L15 5b 78 L16 <br /> y L13 1/2 314 L14 <br /> !C <br /> Ltd <br /> 0 <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your <br /> Monitoring System Certification.On your site plan,show the general layout of tanks and piping.Clearly identify <br /> locationsof the following equipment,if installed: monitoring system control panels;sensors monitoring tank annular <br /> spaces,sumps,dispenser pans,spill containers,or other secondary containment areas; mechanical or electronic line <br /> leak detectors;and in-tank liquid level probes(if used for leak detection).In the space provided,note the date this Site <br /> Plan was prepared. <br /> httpsl.Www.gliffy.can/go4ftl5.r32978487toke=&app=1b5094b0-6042-11e2-bcfd =false 1/3 <br />